Brookside Energy Limited updates investors about initial production results from wells drilled adjacent to the Company's assets in Brookside's SWISH Area of Interest (SWISH AOI), in the world-class Anadarko Basin, Oklahoma. Highlights: Three new wells 1 have recently come on-line within the SWISH AOI, delivering average IP24's of almost 2,000 barrels of oil equivalent per day (78% oil) from horizontal wells drilled in the Sycamore formation (Brookside's primary target) and the Woodford formation; These new wells are all located very close or adjacent to Drilling Spacing Units (DSU's) in which Brookside has acquired a Working Interest; Of particular note are the Flash 1-8-5MXH Sycamore well (IP24 1,978 BOE/day) and Courbet 1-27-22XHW Woodford well (IP24 1,621 BOE/day) which are both located very close to Brookside's operated Jewell Unit in the heart of the SWISH AOI; and The recently drilled and completed Park Place 1-21-16MXH Sycamore well has also delivered very strong productivity (the highest achieved in the area to date) at IP24 2,377 BOE/day (77% oil).