Azure Minerals Limited (ASX: AZS) ('Azure' or 'the Company') is pleased to advise that diamond drilling has recommenced on the Andover Ni-Cu Project (60% Azure / 40% Creasy Group), located in the West Pilbara region of Western Australia.

HIGHLIGHTS

30,000m diamond drilling program underway to define a mineral resource within the mineralised body represented by the 1,050m-long and +200m-deep VC-07 conductor

Downhole electromagnetic (DHTEM) surveying demonstrates significant down-dip extension of VC-07 conductor which will be drill-tested in current program

First two drill rigs are on site and drilling, with the third rig expected to arrive in mid-January

Drilling will also test several other geophysical targets, including the VC-23 conductors where historical drilling by the Creasy Group returned 2m @ 2.1% Ni and 0.44% Cu (ASX: 17 July 2020)

Azure is fully funded to continue its intensive 3-rig exploration and resource definition drill program at Andover with $37 million in cash

Commenting on Azure's 2021 exploration program at Andover, Managing Director, Mr. Tony Rovira said: 'Having confirmed a significant nickel-copper discovery at Andover, the Board of Azure is transitioning the Company's focus from exploration of the VC-07 mineralised body to resource definition.

'Following on from our highly successful maiden drilling campaign undertaken last year, the Company has commenced a 30,000m exploration and resource definition diamond drilling program. To accelerate our progress, three drill rigs will be utilised to define the extent of the VC07 mineralised body, with subsequent in-fill drilling to produce a JORC mineral resource estimate.

'All seven holes drilled to date have intersected significant nickel-copper sulphide mineralisation associated with electromagnetic conductors. With the VC-07 conductor extending east-west for 1,050m, more than 200m vertically and remaining unconstrained at depth, we believe there is excellent potential to define a major nickel-copper sulphide deposit at Andover.

'While most of the planned drilling will focus on the VC-07 conductor, the Andover property is a target-rich environment for further nickel and copper sulphide discoveries. Geophysical surveying has identified numerous conductors indicative of bedrock-hosted sulphide mineralisation and drilling of the first of these prospective targets, VC-23, has commenced.'

Contact:

Tony Rovira

Tel: +61 8 9481 2555

(C) 2021 Electronic News Publishing, source ENP Newswire