Anson Resources Limited has commenced re-entry drilling of the Gold Bar Unit 2 well at its Paradox Lithium Project, located in the "Lithium Four Corners" area in Utah. Drilling will be to a depth of 7,280 feet to sample brine from 4 separate Clastic Zones. The samples will be sent to a certified laboratory in Nevada for assaying, with results expected before the end of January 2018. In addition, flow rates of the brine aquifer will be measured for future modelling, and a bulk sample will be collected for processing in a bench top plant to validate earlier test work on a synthetic brine which showed that lithium carbonate and other products were expected to be able be able to be produced from the brine. Production of first lithium carbonate from the bench top plant is expected in April 2018.