Zodiac Gold Inc. reported additional results from its recently completed Phase II Drill Program at the Arthington target. The Phase II drilling results confirm the expansion of the mineralized strike length at Arthington to 2.4 km, marking a substantial increase to the previous 1 km strike length, with intercepts of multiple mineralized zones including high grades up to 8.98 g/t Au over 1.05 m. The Phase II Drill Program tested an extension of the Red Hill Zone to the Ambulai Field, extending the confirmed mineralized strike length and showcasing the potential for a significant mineral resource. The Arthington target is posi oned within an 18.5 km long district-scale mineraliza on trend and is one of the five high-priority, mul-kilometer drill-ready targets situated within the Company's 2,316 km2 Todi gold project.

Drilling highlights from Arthington to date include 9.65m at 7.5g/t Au, 6.0m at 10.6 g/t Au, 25.90m at 2.10g/t Au including 9.14 m at 4.20 g/t Au, 5.65m at 4.67 g/t Au, 17m at 1.10 g/t Au, 15.38m at 1.06 g/t Au and 10.20 m at 1.23 g/t Au, 14.67m at 1.33 g/t Au including 3.00 m at 4.38 g/t Au and 11.00 m at 1.28 g/t Au. The Company has intersected gold mineralization in all of the Phase II drill holes reported to date, with results for one drill hole still pending. Notable mineralized shear zones were observed in all of the Phase II Drill program, showing continuity of mineralization and underscoring the significant potential of the Arthington target and the Todi Project overall.