Saint Jean Carbon Inc. announced that it is starting a significant drill program on one of its Buckingham mining properties, based on the helicopter born survey that was completed in the fall and the digitalization of the previous drilling. The goal of the drill program is to cover as much of the properties as possible and twin drill existing holes to verify historical information. The end result will help determine a resource model. The Company will use the results of the work program to continue to develop an engineering model and equipment designs for the high speed first commercial shaping and coating mill in North America. The Company is constructing the first stand-alone patent pending mill, as previously announced. The mill will grind, size, shape and coat graphite for the lithium-ion battery industry for use in electric cars and bulk energy storage. Presently any material for production is sourced from a number of off shore graphite mines. The Company will release the results from the drill program as they become available.