Visionary Gold Corp. announced results from the first five drillholes at its Wolf Gold Project ("Wolf") in Fremont County, Wyoming. Gold mineralized zones were encountered in each of the first five drill holes, confirming continuous gold mineralization over 480 metres ("m") of the 2.6- kilometre ("km") shear zone.

Discussion of drill results: The five holes drilled at the Wolf Gold Project in 2021 (WLF001-WLF005) totalled 780m. Gold mineralization occurred in chlorite and limonite-stained fault breccias, veins and zones of intense fracturing within the shear corridor. Interpreted mineralized corridors appear to be continuous over the full 480m; however, the widths and grades of mineralization appear to be increasing slightly to the northeast along strike.

All drill holes in the 2021 program were drilled from northwest to southeast across the interpreted strike of the Wolf Shear Zone; however, future drilling will also test cross cutting structures and shallowly, southeasterly dipping veins, which could have an influence on mineralization. .