Vango Mining Limited announced further gold intersections from drilling at the Company's Marymia Gold Project (Marymia, the Project) in the Mid-West region of Western Australia. These results are from 8 holes at the Prickleys Open pit area. This area was previously mined at a time when the gold price was a fraction of the current price, presenting the opportunity for Vango's current open-pit focused drilling to increase the potential for additional mineable resources. There are significant gold intercepts below the historic pit and this drilling has been designed to test for extensions to these resources as well as repeating structures at depth. Vango's drilling at Prickleys has returned six holes with gold greater than 1g/t often within broad mineralised envelopes >0.3g/t Au. All holes returned gold greater than 0.5g/t. The results confirm the continuity of the mineralised structures below the pit and in areas of previous gold mineralization and significantly extend the depth of the mineralisation in many cases: 10m @ 1.6 g/t Au from 116m in VPKRC0006 incl 3m @ 4.3 g/t Au from 116m; 4m @ 1.0 g/t Au from 45m in VPKRC0007 incl 1m @ 3.5 g/t Au from 48m; 11m @ 0.4 g/t Au from 72m in VPKRC0007 incl 1m @ 1.2 g/t Au from 75m; 10m @ 0.3 g/t Au from 128m in VPKRC0002 incl 1m @ 1.3 g/t Au from 135m; 6m @ 0.5 g/t Au from 139m in VPKRC0004 incl 1m @ 1.2 g/t Au from 143m; 13m @ 0.7 g/t Au from 150m in VPKRC0005 incl 1m @ 2.6 g/t Au from 153m. The mineralisation at Prickleys is within steep mineralised structures broadly following the contact between sediments and mafics. These structures have returned excellent gold intercepts, in historical drilling, from outside the mined area included: 12m at 2.5 g/t Au from 41m in MHR1031; 5m at 6.1 g/t Au from 51m in MHR1505A; 1m at 29 g/t Au from 36m in MHR1577; 8m at 7.0 g/t Au from 43m in MRC1015D; 6m at 5.0 g/t Au from 56m in PCRC0009; 14m at 13.7 g/t Au from 44m in PRC0016_M; 21m at 2.0 g/t Au from 48m in PRC0019_M; 2m at 29.1 g/t Au from 78m in PRC0041_M; 8m at 4.3 g/t Au from 42m in PRC0057_M; 6m at 8.3 g/t Au from 41m in PRC0104_M; 18m at 3.0 g/t Au from 51m in PRD0001; 15m at 9.4 g/t Au from 44m in PRD0002. A second phase of drilling at Prickley is planned to be undertaken to test this mineralised zone further, to determine the tenor of the mineralisation to determine potential resources.