Nevada Exploration Inc. announced that it has commenced its 2020 drilling program at its South Grass Valley Project (the “Project”). An RC drill rig has mobilized to the Project and has begun drilling at its first drill site, located close to Goodwin Butte, within the Freddie target area. The Company expects to complete the drilling program by way of two cycles through the four target areas. For the first cycle, NGE expects to begin by drilling approximately 1,500 metres at each target to confirm the geologic model and exploration concept at each, and then continue with the second cycle through the targets, leveraging the benefits from the additional geologic data from the first cycle. Subject to availability and drilling progress, the Company expects to add a second RC drill rig to complete some of the first-cycle drilling.