Triumph Group, Inc. Secures Follow-On Contract with Bell for AH-1Z Bonded Panels
January 29, 2018 at 04:20 pm
Share
Triumph Group, Inc. announced that, its Fabrications business has signed a long-term agreement with Bell Helicopter to extend their production of bonded panel structures for the AH-1Z attack helicopter through 2021. Triumph’s Fabrications business, under its newly realigned Aerospace Structures business unit, will provide the panels for Lots 15-16 under the follow-on contract agreement. The contract between Triumph Fabrications and Bell for the original scope of work was executed in 2012. Triumph Fabrications is an operating company of Triumph Aerospace Structures. In addition to bonded panels, Triumph Fabrications produces fuselage structures, rotor fairings, leading edges, avionics shelves and fuel pods for Bell Helicopter. In addition to the AH-1Z, Triumph Fabrications produces structural content on the Bell 205, 206, 412, and 525, and fabricated structural content and spares for other military programs.
Triumph Group, Inc. designs, engineers, manufactures, repairs and overhauls a portfolio of aerospace and defense systems, subsystems, components, and structures. It serves the global aviation industry, including original equipment manufacturers (OEMs) and the full spectrum of military and commercial aircraft operators through the aircraft life cycle. It offers products and services through two segments: Triumph Systems & Support, which designs, develops, and supports proprietary components, subsystems, and systems; produces complex assemblies using external designs, and provides full life cycle solutions for commercial, regional, and military aircraft, and Triumph Interiors, which supplies commercial, business, regional, and military manufacturers with insulation parts, interior and composite components to Triumph and customer designs, and the manufacture of thermo-acoustic insulation, environmental control system ducting, and other aircraft interior components for aerospace OEMs.