Titanium Sands Limited announces Final results from the resource infill and extension drilling program completed in August at the Mannar Heavy Minerals Project have been received. These represent analyses of Total Heavy Mineral (THM%) from 1,659 samples from 165 RC aircore drill holes. Results have now been received from all of the 315 holes drilled in the completed program.

Results from the program have previously been reported. As previously announced to the market, the planned program was for about 300 holes with a target depth of 12m deep for a total meterage of around 3,600m. The primary objective of the drilling was to convert more of the resource in the high- grade zone from an inferred to indicated mineral resource category by decreasing the RC aircore drill line separation from a nominal 400m to 200m.

The program was contained within the 8 square kilometre high grade resource zone as outlined in the initial scoping study. Mineralisation extends from the surface down to depths of up to 12m. This high-grade zone contains a mineral resource of 93Mt at 5.24%THM of which 32% is in the indicated category.

It represents 35% of the total current mineral resource estimate for the project of 265Mt at 4.38%THM. The results from this program continue to demonstrate the expected grade continuity and are being used to provide an updated resource statement of this high grade zone that will form the basis for a more advanced scoping study analysis. The updated resource statement is expected to be finalised shortly.