Tiger International Resources, Inc. updated activities and results at the Itogon gold project, Philippines. Assay results from second phase of surface channel sampling by ECR at the Itogon project include 16m averaging 2.28g/t gold (inc. 6m averaging 4.96 g/t) and 16m averaging 1.20 g/t gold. The results from channels MP-13 and 14, MP-18 and 19, MP-20 and 21, MP-28 and MP-33 to 36.

Sampling was carried out under geological supervision. A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Intertek Testing Services Philippines, Inc. ('Intertek'), an internationally accredited independent analytical laboratory in Metro Manila. Upon arrival at Intertek samples were sorted, dried, crushed, split and pulverised.

The method of analysis for gold was fire assay (50g charge) with AAS finish. QA/QC measures including the use of blanks and standards were implemented by ECR and separately by Intertek in relation to the analysis of the samples. The assay data reported is considered acceptable in the context of these measures.