Tietto Minerals Limited report new highgrade gold intersections at its AbujarPischon (AP) Deposit, part of its Abujar Gold Project in Côte d'Ivoire, West Africa. Pischon (AP): ZDD014 (Diamond): 21m @ 2.80 g/t Au from 147m including: 4m @ 2.34 g/t Au from 147m including 1m @ 7.3g/t Au from 149m; and 7m at 6.84 g/t Au from 160m including 2m @ 21.22 g/t Au from 165m which includes 1m @ 26.54 g/t Au from 166m; ZAC02 (Aircore): 42m @ 1.06 g/t Au from 8m including: 16m @ 1.99 g/t Au which includes 2m @ 12.98 g/t Au from 32m (hole ended in mineralisation). Golikro (AGO): ZDD015 (Diamond): 5.5m @ 2.78 g/t Au from 185m including 1m @ 13.81 g/t Au ZAC29 (Aircore): 26m @ 1.06 g/t Au from 26m including 4m @ 4.24 g/t Au from 46m. Reported in this release are 47 aircore (AC) holes for 2,133m and 5 diamond (DD) holes for 991.94m over a 1,700m strike of Pischon and 800m strike of Golikro. Assay results continue to demonstrate highgrade gold mineralisation. AP (Pischon) located 7km south of the highgrade AG deposit hosts an Inferred JORC 2012 Mineral Resource of 1.04Mt @ 1.7g/t Au for 57,600oz. These resources were defined in 2016 from reverse circulation (RC) drilling over 400m strike down to 90m vertical depth. Gold mineralisation at AP and AGO (AbujarGolirko) has now been intersected over a 5km strike using RC, DD and AC drilling. Previous drill results reported include: AP: ZRC085: 28m @ 2.00 g/t Au from 24m inc 6m @ 6.85 Au from 42m; 6m @ 1.28g/t Au from 86m ending in mineralization; ZRC086: 12m @ 2.25 g/t Au from 30m inc 2m @ 10.65 from 40m; ZRC123: 12m @ 1.0g/t Au from 50m inc 4m @1.9g/t Au from 58m; ZRC 132: 14m @1.29g/t Au from 18m inc 4m @ 3.8g/t Au from 20m; ZRC134: 20m @ 1.01g/t Au from 20m inc 8m @ 2.04 g/t Au from 20m; ZRC140: 12 m@ 1.31 g/t Au from 32m; ZDD003: 10m @ 1.23 g/t Au from 28m inc 4m @ 2.29 g/t Au; 7.4m @ 1.16 g/t Au from 108.6m inc 3.5m @ 1.77 g/t Au from 111m; and 4m @ 3.7 g/t Au from 129m inc 0.7m @ 15.96 g/t Au from 131.3m. AGO: ZRC160: 8m @ 4.44g/t Au from 42m to EOH inc 2m @ 15.5g/t Au from 44m; and ZRC159: 6m @ 5.22g/t Au from 36m inc 2m @ 13.85g/t Au from 40m. Drill spacing is approaching 100m by 25m in a number of areas and gold mineralisation has been reported at depths 150m below surface. Tietto is continuing drilling and planning further programs as gold mineralisation remains open at depth, down plunge and along strike. Tietto's 2018/2019 drilling campaign aims to grow and extend the limits of known gold resources at the Abujar Gold Project. Drilling operations continue with RC, DD and AC rigs active on site. Tietto expects the arrival of its own privately owned second DD rig towards the end of February 2019. Drilling results will continue to be reported over the coming weeks and months as the Company works to deliver a material update to its JORC Mineral Resource Estimates for both the AG deposit and the APG deposit.