Sokoman Minerals Corp. provided an update on its current activities and near-term plans. Notable events since the end of Phase 4 drilling include the following: (ol) The Company has commissioned an approximate 800 line-km airborne magnetic survey over the entire property to help map out mafic dikes as well as key structures important for mineralization. Sokoman has completed a till sampling program and the samples were submitted for gold grain study as well as Heavy Mineral Concentrate (HMC) analysis, with the results expected in March 2020. The 3-D Model of Moosehead is in the final stages of production and is expected to be finalized by the start of Phase 5 drilling. A recently released report on the structural controls of mineralization, in association with the 3-D Model, will form the basis of the next drill program. Phase 5 of drilling at Moosehead is expected to start in the beginning of February 2020.