Seafield Resources Ltd. announced initial results, including 113.7 m at 1.63 g/t Au, from the ongoing 6,800-metre infill diamond drill program at the Company's Miraflores Deposit in the Quinchia District, Department of Risaralda, Colombia. Seafield is also reporting the assay values of silver as metallurgical investigations have indicated that silver may be recoverable as a by product at Miraflores. Drill hole QM-DH-38 intersected 113.7 m of 1.63 g/t Au and 2.03 g/t Ag, including 31.75 m of 3.78 g/t Au and 2.95 g/t Ag; Drill hole QM-DH-39 intersected 62.15 m of 1.18 g/t Au and 1.8 g/t Ag, including 4.85 m of 5.28 g/t Au and 1.75 g/t Ag.

This intersection is located near the top of the hole (approximately 7 metres from surface), highlighting mineralization in the potential open pit portion of the deposit; Drill hole QM-DH-40 intersected 110.55 m of 0.78 g/t Au and 2.3 g/t Ag, including 33.75 m of 1.55 g/t Au and 4.2 g/t Ag; Drill hole QM-DH-41 intersected 30.3 m of 1.35 g/t Au and 1.5 g/t Ag, and 23 m of 3.51 g/t Au and 2.9 g/t Ag. The assays reported in this press release represent the results of six diamond drill holes, which account for a total of 1,165.5 metres drilled since November, 2012. Drill holes QM-DH-38 to QM-DH-43 were drilled to further verify the geometry and continuity of the high-grade structures found within the breccia.

The closer spacing in the drilling grid will also be used to improve the confidence in the geological model. The location of the drill holes are highlighted below. QM-DH-38 was drilled from the east, outside of the breccia pipe, towards the west as part of Seafield's infill drilling program aimed at improving the confidence in the current resource at Miraflores.

This drill hole confirms the vertical and horizontal extension of mineralization previously intersected in drill hole QM-DH-32A and QM-DH-33. QM-DH-39 was drilled inside the breccia to the WNW. QM-DH-41 was drilled in the western part of the breccia to the WSW.

Both holes have confirmed the continuity and vertical extension of high grade mineralization in veins and in the breccia at the western border of the pipe. QM-DH-40 and QM-DH-42 were both collared inside the breccia and drilled from the southeast portion with an azimuth of 246 degrees and from the central southern portion with an azimuth of 254 degrees, respectively. Both holes intersected continuous mineralization and confirmed the vertical extension of mineralization (both high and low-grades) previously intersected in hole QM-DH-25.

Hole QM-DH-43 was drilled to the southwest and collared outside of the breccia at an azimuth of 263 degrees and also confirmed this mineralization.