SciDev Limited received a trial purchase order with MMG Limited. The commercial trial will be conducted at the Las Bambas mine in Peru. The commercial trial follows on from earlier successful technical evaluations that SciDev conducted during CY2019. SciDev's MaxiFlox® chemistries will be utilised in the tailings thickener at Las Bambas, with the aim of improving water recovery and ultimately increasing the available volume in the mines tailings storage facility.