Red Eagle Mining Corporation announced results from the 2016 ore production stope delineation drilling programme at the San Ramon Gold Mine, Santa Rosa Gold Project, Antioquia, Colombia. The 10,000m programme was drilled from eight pads spaced over 300m of strike length. 107 diamond drill holes (SRD-0001 to SRD-0107) were drilled on approximately 15m centres from near surface to a vertical depth of 160m from surface. The programme only in-fill drilled a portion of the reserves at the San Ramon Gold Mine which overall extend for 2km of strike length and to 250m depth. The deposit is also open both at depth and on strike to the east where exploration drilling is currently underway. Results from the initial 95 holes (SRD-0001 to SRD-0095) were previously announced. Highlights from the programme include intersections: SRD-0027 – 10.73m at 8.91 g/t Au from 60.66m down hole (incl. 1.20m at 21.39 g/t Au and 1.10m at 35.37 g/t Au); SRD-0029 – 6.70m at 12.69 g/t Au from 69.80m down hole (incl. 1.40m at 45.06 g/t Au); SRD-0038 – 8.25m at 5.89 g/t Au from 37.25m down hole (incl. 0.65m at 36.17 g/t Au); SRD-0038 – 5.45m at 11.53 g/t Au from 54.55m down hole (incl. 0.92m at 30.81 g/t Au); SRD-0043 – 2.70m at 20.56 g/t Au from 81.20m down hole (incl. 0.93m at 49.26 g/t Au); SRD-0044 – 4.25m at 20.60 g/t Au from 89.75m down hole (incl. 0.74m at 78.35 g/t Au and 0.45m at 40.21 g/t Au); SRD-0046 – 12.56m at 7.66 g/t Au from 67.64m down hole (incl. 1.05m at 48.70 g/t Au); SRD-0046 – 9.68m at 7.89 g/t Au from 94.70m down hole (incl. 0.70m at 48.88 g/t Au); SRD-0046 – 2.07m at 42.62 g/t Au from 130.70m down hole; SRD-0047 – 5.21m at 7.47 g/t Au from 93.15m down hole (incl. 1.41m at 19.18 g/t Au); SRD-0049 – 7.16m at 29.03 g/t Au from 131.82m down hole (incl. 2.31m at 73.96 g/t Au); SRD-0054 – 3.92m at 12.83 g/t Au from 50.78m down hole (incl. 1.40m at 30.70 g/t Au); SRD-0068 – 2.90m at 27.35 g/t Au from 69.90m down hole; SRD-0083 – 4.05m at 10.45 g/t Au from 68.30m down hole; SRD-0091 – 2.40m at 23.34 g/t Au from 72.60m down hole; SRD-0093 – 12.60m at 16.47 g/t Au from 89.90m down hole (incl. 0.50m at 83.60 g/t Au); SRD-0101 – 5.15m at 33.39 g/t Au from 89.55m down hole (incl. 0.60m at 75.56 g/t Au); SRD-0105 – 6.15m at 12.82 g/t Au from 90.15m down hole (incl. 0.95m at 41.40 g/t Au). Results from the delineation drilling exceeded expectations with intercepts often significantly longer that the average mining width of 3m and grades significantly higher than the reserve grade of 5.2 g/t Au. Plans and cross sections can be found on Red Eagle Mining'swebsite. Drill assays were composited by length-weighted averaging into intersections using a 2 g/t Au cut-off grade. Due to the mining method and mining selectivity contemplated for the deposit, internal dilution was included in some intersections where considered appropriate for mining continuity.