PRYME N.V.
Q1 2024 REPORT
May 3rd, 2024
PRYME N.V. - Q1 2024 Report | 1 | |
Pryme N.V. - First Quarter 2024 Report
Pryme One Update
The main event of Q1 2024 was undoubtedly the successful production of first oil on January 19th, 2024. This marked one of the most significant milestones in Pryme's young history and will stand forever in our history book. With the first oil produced, the main focus of the quarter became to further build on that accomplishment and further progress Pryme One's production capabilities as explained below.
Having successfully completed the required mechanical upgrades on Pryme One's electrically heated reactor in the last weeks of 2023, the new year was initiated with the restart of hot commissioning activities. The reactor was reheated and maintained at temperatures above 600 degrees Celsius for multiple days to confirm all modifications were adequate. After this, the operation team reached a major milestone through producing "first oil" on January 19th, 2024. This initial production of oil occurred using a method termed "cold feeding" where un-melted plastic waste was fed into the reactor, bypassing the pre-melting step through one of the plant's extruders. This allowed for individual testing of the reactor and subsequent condensation steps. Building on the first oil success, subsequent test runs in February included the integration of the entire process cycle, utilizing an extruder to inject hot melted plastic waste at approximately 300 degrees Celsius into the reactor with its temperature at more than 600 degrees Celsius. This initial comprehensive operational trial was executed without any complications. Over two days, totaling six hours of operation, Pryme One processed around 8 metric tons of plastic waste, yielding approximately 6 metric tons of pyrolysis oil. Following this accomplishment, production was paused for a detailed inspection of all machinery and equipment by the Pryme team to evaluate each component's performance, potential wear and tear, maintenance frequency requirements and the overall structural integrity of the production equipment, including seals, gaskets, and piping. These first-quarter production tests have validated Pryme's technology, with Pryme's electrically heated reactor consistently producing odorless, free-flowing dry ash with no wax formation observed during subsequent condensation steps. Also, the residence time of the melted plastic in the reactor before its conversion to a gas phase was notably shorter than initially anticipated. These initial observations offer a promising outlook for Pryme's ramp-up activities in the second quarter and Pryme's potential.
Pyrolysis Oil Sales Contract
On February 1st, 2024, Pryme successfully revised its supply contract of plastic pyrolysis oil with Shell. This amendment aligned the historical supply contract with what Pryme deemed to be prevailing market conditions for pyrolysis oil, while fostering a robust and beneficial value chain for both Pryme and Shell. The revised contract integrated insights gained from developing the new value chain and featured terms that more accurately reflect the current dynamics in this promising market. The contract secures a direct outlet for Pryme for its pyrolysis oil volumes, which serve as a feedstock for Shell. Pryme expects the amended terms to materially improve the resulting financial performance of Pryme One. This expected improvement has been further described in Pryme's updated plant economics and investor presentation that were published on March 20, 2024.
Funding
On March 25th, Pryme completed a private placement with gross proceeds of EUR 12 million. The subscription price in the Private Placement was EUR 0.9469 per share, corresponding to NOK 11.00 per share, a premium of 14% over the closing price on March 25th. The net proceeds to Pryme from the Private Placement will be used for the ramping up and optimization of Pryme One, the defining and executing of Pryme's growth strategy including the development and permitting of future plant sites and for working capital and general corporate purposes.
The subscribers to the private placement were, Taranis Investment Limited, a new shareholder in Pryme and the investment arm of the Perenco group, with around EUR 10 million, Stichting Multistrat with EUR 1 million and Circular Plastics Coöperatief U.A with around 1 million, the latter being managed by Infinity Recycling.
PRYME N.V. - Q1 2024 Report | 2 | |
PAct, Pryme 'Health, Safety & Environment and Code of Conduct
During the reporting period, Pryme's focus shifted from building and hot commissioning activities to production and first oil. With new activities, the risk profile of Pryme One changed accordingly. No safety incidents were reported, underscoring Pryme's commitment to maintaining a robust safety culture. Operating in a high-risk petrochemical environment, it is imperative that we continue to prioritize safety above all else. Ensuring the health and safety of our employees, contractors, and the environment in which we operate, remains Pryme's top priority, reflecting Pryme's deeply embedded safety culture. During the reporting period we implemented the Pryme' Code of Conduct and related reporting procedures including staff training sessions.
Organization
To deliver on the broader set of priorities of the company, Pryme plans to expand its organization and secure the necessary staff resources in the coming months for developing future sites and building additional plants. This organizational growth will occur across technical, operational, project management, and commercial areas. Pryme aims to build on the skills of the Company's existing staff and to recruit additional personnel where specific expertise or additional capacity is required.
On March 20th, Christopher Hervé, Pryme's CEO, has given notice. Christopher will remain on board until the end of July 2024 to ensure the proper startup of Pryme One. The company has initiated a search for a new CEO with a profile that aligns with the company's priorities.
Subsequent events
- On April 9th, 2024, in an extraordinary general meeting (EGM), Pryme's shareholders approved a capital increase by way of issue 12,672,933 common shares in order to fulfil the private placement that was completed on March 25th, 2024.
- On April 9th, 2024, the EGM appointed Emmanuel Colombel as a member of the supervisory board for the period until the end of the 2027 AGM.
- On April 17th, 2024, Pryme received confirmation from the Netherlands Enterprise Agency that the DEI grant of € 5.0 million that has been applied in the development and construction of Pryme One has been approved.
- On April 23rd, 2024, Pryme N.V. issued and delivered 2,052,156 of the 12,672,933 shares of the private placement. The remaining shares will be issued and delivered as soon as the related private placement subscriber has established a VPS account.
- On April 25th, 2024, Pryme reached the production milestone of 30 metric tons of pyrolysis oil produced.
Outlook - Q2 2024
With the core process now proven, demonstrated by the smooth flow of feedstock into the extruder, normal operating pressures of melted plastic through the melt pipe, and our electrically heated reactor yielding short residence times, ash free of residual polyolefins, and no waxing in the subsequent condensation steps-Pryme can now focus on ramping up production. Pryme's teams will concentrate on balancing the optimal condensation parameters to maintain a stable flow between the oil and the non-condensable gases, while extracting important production data through repeated campaign runs. Through these efforts, we expect to produce at least 500 tons of pyrolysis oil in the second quarter. Simultaneously, final regulatory preparations are being completed to meet delivery requirements for our first shipments to Shell. We anticipate that first revenues will materialize in May, marking a significant milestone for Pryme as it transitions from a mere project into an operating company. Concurrently to ramping up Pryme One, Pryme is increasing its focus on site selections and pre-permitting activities for future Pryme plants.
PRYME N.V. - Q1 2024 Report | 3 | |
Q1, 2024 INTERIM FINANCIAL STATEMENTS
- UNAUDITED FIGURES -
Consolidated Statement of Financial Position
(In EUR * 1,000)
31-3-202431-12-2023
Assets
Non-current assets | ||
Intangible assets | ||
Development costs | 5.825 | 6.132 |
Property, plant, and equipment | ||
Plant and equipment | 36.100 | 39.038 |
R&D equipment | 710 | 775 |
Office improvements & furniture | 98 | 107 |
Right-of-use assets | 3.824 | 5.661 |
Financial assets | ||
Other amounts receivable | 175 | 175 |
Deferred taxes | 1.102 | 1.608 |
Total non-current assets | 47.834 | 53.496 |
Current assets | ||
Inventories | 86 | 83 |
Trade receivables, other receivables and prepaid expenses | 1.057 | 1.412 |
Cash & cash equivalents | 1.769 | 8.204 |
2.912 | 9.700 | |
Assets held for sale | 1.431 | 0 |
Total current Assets | 4.343 | 9.700 |
Total Assets | 52.177 | 63.196 |
Equity & Liabilities | ||
Group Equity | 34.981 | 39.479 |
Provisions | ||
Provision for decommissioning | 638 | 638 |
Liabilities | ||
Non-current liabilities | ||
Government grants | 1.861 | 1.949 |
Payables to banks | 6.705 | 6.901 |
Leasing liabilities | 3.320 | 5.136 |
Deferred taxes | 1.117 | 1.608 |
Other liabilities | - | 272 |
Total non-current liabilities | 13.003 | 15.866 |
Current liabilities | ||
Payables to banks | 767 | 756 |
Leasing liabilities | 598 | 668 |
Trade payables | 589 | 1.713 |
Payables relating to taxes and social security contributions | 95 | 183 |
Other liabilities and accrued expenses | 1.506 | 3.893 |
Total current liabilities | 3.555 | 7.212 |
Total equity and liabilities | 52.177 | 63.196 |
PRYME N.V. - Q1 2024 Report | 4 | |
Notes to the Consolidated Statement of Financial Position
On February 6th Pryme decided to sell the Amsterdam site. In the balance sheet as of 31 March 2024 all related assets and liabilities have been reclassified as Assets held for sale. The Assets held for sale encompass:
Assets held for sale | |
Assets | |
Plant and equipment | 1.800 |
Right-of-use assets related to ground lease | 1.903 |
Deferred taxes | 506 |
4.209 | |
Liabilities | |
Non-current leasing liabilities related to ground lease | -1.862 |
Non-current liability related to overdue ground lease terms | -218 |
Deferred taxes | -491 |
Current leasing liabilities related to ground lease | -99 |
Current liability related to overdue ground lease terms | -108 |
-2.778 | |
Net assets directly associated with the anticipated disposal of the Amsterdam site | 1.431 |
There were no reclassifications or changes in accounting policy in Q1 2024 except for the reclassification of the assets and liabilities related to the Amsterdam site.
Following the completion of the Pryme One installation at the end of 2023, Pryme has paid most of its construction related suppliers, which is reflected in the strong reduction in trade payables and other liabilities and accrued expenses and cash balance.
PRYME N.V. - Q1 2024 Report | 5 | |
Consolidated Statement of Profit and Loss | |||
(In EUR * 1,000) | Q1 2024 | 2023 | |
Expenses | |||
Personnel expenses | -1.797 | -3.981 | |
Social security premiums and pension cost | -172 | -461 | |
Other operating expenses | -968 | -2.818 |
Total expenses | -2.937 | -7.259 |
Operating income (EBITDA) | -2.937 | -7.259 |
Depreciation and amortization | -1.671 | -1.008 |
Impairment losses | 0 | -7.163 |
Operating result (EBIT) | -4.608 | -15.430 |
Financial income | 659 | 304 |
Financial expenses | -817 | -285 |
Profit before taxes | -4.766 | -15.411 |
Income tax | 0 | 0 |
Net profit (loss) | -4.766 | -15.411 |
Notes to the Consolidated Statement of Profit and Loss
- In the first quarter Pryme produced its first pyrolysis oil. However, no deliveries to customers occurred and consequently, no revenues were recognized.
- The personnel costs amounted to EUR 1.797k, reflecting the costs of the introduction of the 24/6 work shift regime in anticipation of Pryme One entering into operational mode.
Consolidated Statement of Changes in Equity | |||||
Share- | |||||
Share | based | ||||
Share | premium | payments | General | Total | |
(In EUR * 1,000) | capital | reserve | reserve | reserve | equity |
Balance at 1 January 2024 | 2.419 | 59.874 | 455 | -23.269 | 39.479 |
Result for the period | -4.766 | -4.766 | |||
Issue of shares (Private Placement) | 0 | 0 | 0 | ||
Accrued for LTI plan | 268 | 268 | |||
Issue of RSUs and excercise options LTI plan | 0 | 0 | 0 | 0 | 0 |
Balance as of 31 March 2024 | 2.419 | 59.874 | 723 | -28.035 | 34.981 |
PRYME N.V. - Q1 2024 Report | 6 | |
Consolidated Statement of Cash Flow | ||
(In EUR * 1,000) | Q1 2024 | 2023 |
Cash Flows from/used in operating activities | ||
Net income after taxes | -4.766 | -15.411 |
Adjustments to reconcile net income to net cash flows | ||
Amortization and depreciation | 1.700 | 1.127 |
Impairment PPE | 0 | 7.163 |
Long-term incentive plan | 268 | 405 |
Interest charges related to leases | 92 | 296 |
Cancellation lease | 0 | -2 |
Movements in provisions | 0 | 638 |
Movement in government grants | -88 | -371 |
Finance income | -45 | -304 |
Finance expense/ exchange differences (non-lease) | 112 | -11 |
Movements in working capital | ||
Movements in inventory | -3 | -83 |
Movements accounts receivable | 287 | 368 |
Movements in trade payable | -1.124 | 764 |
Movements in other payables | -2.367 | 472 |
Interest received | 62 | 278 |
Interest paid | -204 | -748 |
Net Cash Flow from operating activities | -6.076 | -5.419 |
Cash Flow from investment activities | ||
Purchase of Property Plant & Equipment | -1 | -13.939 |
Increase/decrease of Financial Assets | 0 | 67 |
Government grants received in advance | 0 | 2.357 |
Net Cash Flow from investment activities | -1 | -11.516 |
Cash Flow from financing activities | ||
Private placement | 0 | 14.704 |
Payments arising from bank financing | -185 | -541 |
Payments arising from lease liabilities | -171 | -760 |
Proceeds sale and lease-back | 52 | 499 |
Repayment other non-current liabilities | -54 | -283 |
Net Cash Flow from Financing Activities | -358 | 13.619 |
Total Cash Flow for period | -6.435 | -3.315 |
Cash and cash equivalents at the beginning of the period | 8.204 | 11.519 |
Net Cash Flow in the period | -6.435 | -3.315 |
Cash and cash equivalents at the end of the period | 1.769 | 8.204 |
PRYME N.V. - Q1 2024 Report | 7 | |
STATEMENT BY THE MANAGEMENT BOARD
The Management Board has today considered and approved the First Quarter 2024 Report of Pryme N.V. for the period from 01.01.2024 through 31.03.2024. We confirm, to the best of our knowledge, that the financial information contained in this report has been prepared in accordance with International Financial
Accounting Standards-EU (IFRS) and gives a true and fair view of Pryme N.V. and its group companies'
assets, liabilities, financial position and profit or loss as a whole. We also confirm, to the best of our knowledge, that the updates in this report include a fair review of important events that have occurred during the first quarter of the financial year 2024 and that their impact on the condensed set of consolidated financial statements is reflected adequately.
Rotterdam, May 3rd, 2024
Christopher Hervé - CEO
About Pryme | www.pryme-cleantech.com
Pryme N.V. is an innovative cleantech company focused on converting plastic waste into valuable products through chemical recycling on an industrial scale. Its efficient and scalable technology is based on a proven pyrolysis process that has been further developed and enhanced with proprietary characteristics. The company has initialized production at its first plant in the port of Rotterdam, with an expected nameplate intake capacity of about 40,000 tons of plastic waste annually. Pryme's ambition is to contribute to a low- carbon, circular plastic economy and to realize the large rollout potential of its technology through the development of a broad portfolio of owned-operated plants with strategic partners. The company is listed on Euronext Oslo Growth market. Pryme can be followed on LinkedIn.
Forward Looking Statements
This First Quarter 2024 Report (the "Q1 2024 Report") is produced by Pryme N.V. (the "Company" or "Pryme") and contains several forward-looking statements relating to the business, financial performance and results of Pryme, its subsidiaries and/or the industry in which it operates. Forward-looking statements concern future circumstances and results and other statements that are not historical facts, sometimes identified by the words "believes", expects", "predicts", "projected", "plans", "forecasts", "estimates", "anticipated", "targets", "will", "continue" and similar expressions. Forward-looking statements include statements regarding objectives, goals, strategies, outlook and growth prospects; future plans, events or performance and potential for future growth; liquidity, capital resources and capital expenditures; profit; margin, return on capital, cost or dividend targets; economic outlook and industry trends; developments of the Company's markets; the impact of regulatory initiatives; and the strength of the Company's competitors. The forward-looking statements contained in this Q1 2024 Report, including assumptions, opinions and views of the Company, are based upon various assumptions, including without limitation, management's examination of historical operating trends, data contained in the Company's records and other data available from third party sources. Although the Company believes that these assumptions were reasonable when made, the forward-looking statements provided in this report are solely opinions and forecasts that are uncertain and subject to risks, contingencies and other important factors which are difficult or impossible to predict and are beyond its control. A number of factors can cause actual results to differ significantly from any anticipated development expressed or implied in this Q1 2024 Report. No representation is made that any of these forward-looking statements or forecasts will come to pass or that any forecast result will be achieved and the reader is cautioned not to place any undue reliance on any forward-looking statement. Any information obtained from third parties has been accurately reproduced and, as far as the Company is aware and able to ascertain from the information published by that third party, no facts have been omitted that would render the reproduced information to be inaccurate or misleading.
PRYME N.V. - Q1 2024 Report | 8 | |
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Pryme NV published this content on 06 May 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 06 May 2024 14:48:10 UTC.