20th January 2012
Company Announcements Officer
ASX Limited
Exchange Centre
Level 4, 20 Bridge Street
SYDNEY NSW 2000
Dear Sir
We enclose herewith a copy of an announcement in relation to the above. Yours faithfully
David P.A. Singleton MANAGING DIRECTOR & CHIEF EXECUTIVE OFFICEREnc
CORPORATE DIRECTORY Principal OfficeUnit 8, Churchill Court Director / Senior Management 331-335 Hay Street David Singleton Managing Director & Chief Executive Officer SUBIACO WA 6008
Andrew Forrest Non-Executive Chairman P: 61 8 9382 8799
Geoff Brayshaw Non-Executive Director F: 61 8 9382 4760
Richard Monti Non-Executive Director
Chris Indermaur Non-Executive Director Registered Office
Ross Kestel Company Secretary Level 2, Spectrum
100 Railway Road
Corporate Enquiries SUBIACO WA 6008Mr David Singleton - MD & CEO P: 61 8 9367 8133
P: 61 8 9382 8799 F: 61 8 9367 8812
F: 61 8 9382 4760
Media EnquiriesE: admin@poseidon-nickel.com.au Mr Paul Downie
FT Consulting
P: 61 8 9386 1233 M: 0414 947 129
Shareholder Enquiries E: paul.downie@fticonsulting.comEnquiries concerning shareholdings should be addressed to:
Home ExchangeComputershare Investor Securities The Company's shares are listed
GPO Box D182, Perth WA 6840 on the Australian Securities Exchange
P: 61 8 9323 2000 and the home exchange is Perth
ASX code: POS
POSEIDON N I CKEL LIM I T E D • Unit 8 • Churchill Court • 331-335 Hay Street • Subiaco • WA 6008
PO Box 190 • West Perth WA 6872 • T +618 9382 8799 • F +618 9382 4760 • www.poseidon-nickel.com.au • ABN 60 060 525 206
Page 2
ASX Announcement 20th January 2012
Windarra Nickel Project final documentation for approvals now submitted to Department of State Development in WA• Poseidon has now submitted all of the necessary Windarra Nickel Project Mining Proposals and Works Approvals to the Department of State Development
• Proposal outlines plans for approximately 700,000 tonne per annum production from Mt Windarra and Cerberus combined
• Approvals are expected in March 2012
Poseidon Nickel (Poseidon) is pleased to announce that it has
submitted detailed Mining Proposals and Works Approvals for
the Windarra Nickel Project to the Western Australian
Government in order to seek approval to both restart mining
operations and to build a processing plant on the site. The
Mt Windarra proposal was submitted in November 2011 and the
remaining project proposals including Cerberus, co-product
treatment and tailings disposal have now been submitted. No
further mining proposals are required prior to operational
start up.
The proposal includes mining up to 700,000 tonnes of ore per
annum from both Mt Windarra and Cerberus combined with an
initial mine life of six years. The Windarra Project has a
resource base of 9.2 million tonnes of ore at an average
nickel grade of 1.51%.
Poseidon plan to build a 700,000 tonne capacity nickel
sulphide concentrator to process ore from Mt Windarra and
from the Cerberus mine. The indicated construction time for
the plant and associated infrastructure is approximately 12
months and will be built largely inside the footprint of the
historical plant. The size of the plant selected provides
good economies of scale and processing costs are likely to be
in line with other nickel peer producers in Western
Australia.
The Mining Proposal application includes the following major
infrastructure:
• Existing underground mine, ventilation shafts, access portal and underground crusher chamber.
• Refurbishment of existing vertical haulage shaft to reduce decline haulage costs.
• Flotation concentrator plant including power plant and water.
• Accommodation camp, use of exiting administration buildings, workshops and lay down areas.
• Development of the Cerberus underground access portal.
• Tailings storage facilities.
• Co-product treatment facilities.
The development proposals have been submitted to the Western Australian Department of State Development in compliance with the 'Poseidon Nickel Agreement Act 1971,' the associated Variation Agreement and Deed of Covenant. The Act envisages a response by the Government within two months of the final Application being submitted.
Page 3
Poseidon Nickel is developing the Windarra Nickel Project in
Western Australia. The project is a higher grade nickel
sulphide deposit that has demonstrated high recovery levels
through a standard nickel floatation concentrator. The total
current Mineral Resource is located at two positions
approximately 10kms apart and includes the existing
brownfields mine at Mt Windarra and a new discovery at
Cerberus. Poseidon is on track to complete its definitive
feasibility study in early 2012 and is targeting initial
concentrate production in
2013. The concentrator plant to be constructed at Mt Windarra
is expected to have a nameplate capacity of 700,000 tonnes of
ore per annum.
Windarra Nickel Project Sulphides | Cut Off Grade | Resource Category | |||||||||
Windarra Nickel Project Sulphides | Cut Off Grade | ||||||||||
Windarra Nickel Project Sulphides | Cut Off Grade | Indicated | Inferred | TOTAL | |||||||
Windarra Nickel Project Sulphides | Cut Off Grade | Tonnes | Ni% Grade | Ni Metal t | Tonnes | Ni% Grade | Ni Metal t | Tonnes | Ni% Grade | Ni Metal t | |
Mt Windarra | 0.75% | 910,000 | 1.24 | 11,300 | 2,955,000 | 1.72 | 50,900 | 3,865,000 | 1.61 | 62,200 | |
South Windarra | 0.80% | 771,665 | 0.98 | 7,533 | - | - | - | 771,665 | 0.98 | 7,533 | |
Cerberus | 0.75% | 2,773,041 | 1.25 | 34,637 | 1,777,743 | 1.91 | 33,996 | 4,550,784 | 1.51 | 68,633 | |
Total Sulphide | 4,454,706 | 1.20 | 53,470 | 4,732,743 | 1.79 | 84,896 | 9,187,449 | 1.51 | 138,366 |
Note: The information in this report relates to Exploration Results and Mineral Resources based on information compiled by Mr N Hutchison, General Manager of Geology at Poseidon Nickel, who is a Member of The Australian Institute of Geoscientists and Mr I Glacken who is a Fellow of the Australasian Institute of Mining and Metallurgy as well as a full time employee of Optiro Pty Ltd. Mr Hutchison and Mr Glacken both have sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the
'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.' Mr Hutchison and Mr Glacken have consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The Australian Securities Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release.
distribué par | Ce noodl a été diffusé par Poseidon Nickel Limited et initialement mise en ligne sur le site http://www.poseidon-nickel.com.au. La version originale est disponible ici. Ce noodl a été distribué par noodls dans son format d'origine et sans modification sur 2012-01-20 01:08:33 AM et restera accessible depuis ce lien permanent. Cette annonce est protégée par les règles du droit d'auteur et toute autre loi applicable, et son propriétaire est seul responsable de sa véracité et de son originalité. |
Documents associés | |
Final Documentation for Approvals now Submitted to DSD |