Oil Search Limited announced exploration and appraisal drilling update. Well Name: Muruk 2, Status; During the month, 13-3/8" inch casing was set and the well was drilled through the Ieru Formation in a 12-1/4" inch hole. At the end of December, the well was at a depth of 3,130 metres and 9-5/8" inch casing was being run prior to drilling ahead in a 8-1/2" hole. The forward plan is to continue drilling through the Ieru Formation towards the target Toro Formation. Well Name: Pikka B, Status; During December, construction of the ice road and ice pad were completed, allowing rig mobilization to the well site. Drilling commenced on 31 December 2018. Well Name: Pikka C, Status; During December, construction of the ice road and ice pad were completed in preparation for rig mobilization to the well site.