Noram Lithium Corp. announced it is providing an update on its 100% owned Zeus Lithium Project, located in Clayton Valley, Nevada. The Company recently completed a third phase of metallurgical testing on Zeus drill core at Kemetco Research Inc. in Richmond, BCCanada and confirmed the metallurgical processing flow sheet for the Project.

During the final phases of the test work program, high purity lithium carbonate was produced from solution generated by large laboratory scale batch leach tests. The purity of the lithium carbonate produced was 99.2%. The main impurities remaining in the lithium carbonate were small traces of sodium and potassium sulphate.

In the industrial scale process, the lithium carbonate will be subjected to bicarbonation, where the lithium carbonate is redissolved with carbon dioxide. This process allows for a more thorough removal of sodium and potassium than can be achieved on a laboratory sample. Based on these encouraging results, there is a high level of confidence that battery grade lithium carbonate (+99.5%) can be achieved at a commercial scale at Zeus.