Golden Independence Mining Corp. announced initial drill results from its recently completed 2020 resource expansion drill program at the Independence project, south of Battle Mountain, Nevada. Results from the first 3 reverse circulation (RC) holes drilled include: 0.45 g/t gold and 3.3 g/t silver over 110 feet (33.5 metres) including 1.11 g/t gold and 7.8 g/t silver over 20 feet (6.1 metres), 0.57 g/t gold and 3.1 g/t silver over 55 feet (16.8 metres), 0.42 g/t gold and 6.8 g/t silver over 80 feet (24.4 metres). All samples were shipped to the ALS Minerals prep lab in Elko, Nevada with analyses completed at he ALS Minerals Lab in Reno, Nevada. Both facilities are ISO 9001:2015 and ISO/IEC 17025:2017 certified. All samples are analyzed utilizing ALS ME-ICP41 procedure, an aqua regia digestion with ICP- AES finish, with gold determined by the Au-AA23 procedure, a 30-gram fire assay with AAS finish. ALS Minerals is independent from Golden Independence. Golden Independence institutes a rigorous QA/QC program of duplicate samples, blanks and standards. Based on a review of the QA/QC data is not aware of any other factors that could materially affect the accuracy or reliability of the data referred to herein.