08/01/2022

Baguari Hydro Power Plant informs increase in Doce river flow
renewable


  • Yes
  • Yes
  • Yes
Page Content


Due to the heavy rains falling in Doce river region, Baguari Hydro Power Plant (HPP) informs that it is expected an increase in the flows reaching its reservoir.

Baguari HPP also informs that:

  • The plant is monitored on a 24/7 basis and is currently within normal standards of operational excellence and safety;

  • Baguari HPP is a run-of-the-river plant. For this reason, the water volume arriving at the plant must be released, even in periods of heavy rainfall, since its reservoir has no storage capacity.

<_ie3a_menuitem id="MSOMenu_Help" iconsrc="/_layouts/15/images/HelpIcon.gif" onmenuclick="MSOWebPartPage_SetNewWindowLocation(MenuWebPart.getAttribute('helpLink'), MenuWebPart.getAttribute('helpMode'))" text="Help" type="option" style="display:none">
Achou interessante? Inscreva-se na nossa Newsletter!
Nome*:
E-mail*:
Data de Nascimento*:
Localidade*: Selecione a UF Acre Alagoas Amapá Amazonas Bahia Ceará Distrito Federal Espírito Santo Goiás Maranhão Mato Grosso Mato Grosso do Sul Minas Gerais Pará Paraíba Paraná Pernambuco Piauí Rio de Janeiro Rio Grande do Norte Rio Grande do Sul Rondônia Roraima Santa Catarina São Paulo Sergipe Tocantins
Li e aceito a política de privacidade da Newsletter
Inscreva-se
Related information

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Neoenergia SA published this content on 09 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 11 January 2022 13:57:03 UTC.