Cautionary Statement Concerning Forward-Looking Statements

The following discussion and analysis should be read in conjunction with our audited consolidated financial statements and related notes included in this report. This report contains "forward-looking statements." The statements contained in this report that are not historic in nature, particularly those that utilize terminology such as "may," "will," "should," "expects," "anticipates," "estimates," "believes," or "plans" or comparable terminology are forward-looking statements based on current expectations and assumptions.

Various risks and uncertainties could cause actual results to differ materially from those expressed in forward-looking statements. Factors that could cause actual results to differ from expectations include, but are not limited to, those set forth under the section "Risk Factors" set forth in this report.

The forward-looking events discussed in this report, the documents to which we refer you and other statements made from time to time by us or our representatives, may not occur, and actual events and results may differ materially and are subject to risks, uncertainties and assumptions about us. For these statements, we claim the protection of the "bespeaks caution" doctrine. All forward-looking statements in this document are based on information currently available to us as of the date of this report, and we assume no obligation to update any forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results to differ materially from any future results, performance or achievements expressed or implied by such forward-looking statements.





COVID-19


The recent outbreak of the coronavirus COVID-19 has spread across the globe and is impacting worldwide economic activity. Conditions surrounding the coronavirus continue to rapidly evolve and government authorities have implemented emergency measures to mitigate the spread of the virus. The outbreak and the related mitigation measures have had and will continue to have a material adverse impact on global economic conditions as well as on the Company's business activities. The extent to which COVID-19 may impact the Company's business activities will depend on future developments, such as the ultimate geographic spread of the disease, the duration of the outbreak, travel restrictions, business disruptions, and the effectiveness of actions taken in the United States, Mexico and other countries to contain and treat the disease. These events are highly uncertain and, as such, the Company cannot determine their financial impact at this time. No adjustments have been made to the amounts reported in the consolidated financial statements as a result of this matter.





The Company


Mexus Gold US is an exploration stage mining company engaged in the evaluation, acquisition, exploration and advancement of gold, silver and copper projects in the State of Sonora, Mexico. Mexus Gold US is dedicated to protect the environment and provide employment and education opportunities for the communities that it operates in.

Our President and CEO, Paul Thompson, brings over 45 years' experience in mining and mining development to Mexus Gold US. Mr. Thompson is currently recruiting additional management personnel for its Mexico and Nevada mining operations.

Our executive offices are located at, 1805 N. Carson Street, #150, Carson City, Nevada 89701. Our telephone number is (916) 776 2166.

We were originally incorporated under the laws of the State of Colorado on June 22, 1990, as U.S.A. Connection, Inc. On September 18, 2009, we changed our domicile to Nevada and changed our name to Mexus Gold US to better reflect our new business operations. Our fiscal year end is March 31st.


--------------------------------------------------------------------------------
                                       19

--------------------------------------------------------------------------------

Description of the Business of Mexus Gold US

Mexus Gold US is engaged in the evaluation, acquisition, exploration and advancement of gold exploration and development projects in the United Mexican States, as well as the salvage of precious metals from identifiable sources. Our main activities in the near future will be comprised of our mining operations in Mexico. Our mining opportunities located in the State of Sonora, Mexico will provide us with projects to recover gold, silver, copper and other precious metals.

In addition, our management will look for opportunities to improve the value of the gold projects that we own or may acquire knowledge of or may acquire control through exploration drilling, introduction of technological innovations or acquisition with the goal of developing those properties into operating mines. We expect that emphasis on gold project acquisition and development will continue in the future.





Business Strategy


Our business plan was developed with the overriding goal of maximizing shareholder value through the exploration and development of our mineral properties, utilizing the extensive mining-related background and capabilities of our management consultants and advisors. To achieve this goal, our business plan focuses on the following prospective areas:





Mining Operations


We classify our mineral properties into three categories: "Development Properties", "Advanced Exploration Properties", and "Other Exploration Properties". Development Properties are properties where a decision to develop the property into a producing mine has been made. Advanced Exploration Properties are those properties where we retain a significant ownership interest or joint venture and where there has been sufficient drilling and analysis to identify and report proven and probable reserves or other mineralized material. We currently do not have a Development Property or Advanced Exploration Property. Other Exploration Properties are those that do not fall into the other categories. Please see below for information about our Other Exploration Properties.

Effective March 31, 2011, we acquired Mexus Gold S.A. de C.V. (our wholly owned subsidiary) and began funding mining operations in Mexico. A small placer processing operation was instituted to evaluate various areas of interest within the project lands held by Mexus Gold S.A. de C.V.

Mexus Properties and Future Plans

Santa Elena Gold Project

The Company is managed by Paul Thompson Sr., President. The Santa Elena mine is located 54km NW of Caborca, Sonora State, Mexico. This fully permitted project consists of 9 concessions and totals over 6500 acres. The property is easily accessible from the local highway with major infrastructure a short distance away. The Santa Elena project is 100% owned by Mexus Gold US.

Exploration at the Santa Elena project area has been systematically directed as initial surface geologic mapping and sampling with some ground geophysical surveys as electro magnetics and radiometric. Evaluation of results has led to continued production sampling with percussion drilling and diamond core drilling of portions of areas of interest. This resulted in 3 major geologic structures which are open pit mined and are the main source of production. The producing structures are all associated with mixed hydrothermal quartz vein fissure filling and orogenic thrust fault conduits and are in the order of 0.5 to 9 g/t gold. Additional structures are in the area and will soon be evaluated and brought to production. The exploration resulted in the discovery of three major targets on Mexus' three of nine concessions located on the Santa Elena gold project. This resulted in the company opening 3 pits: Julio 1, Julio 2 and Mexus 3. Mineralized material was crushed to 1/2inch minus and transferred to the existing heap leach pad via a conveyor system. All three pits show mineable grade gold up to 1 oz. per ton. All 3 pits show a viable chemistry after running four months and testing an estimated 25,000 tons. As of June 30, 2022, the Company is producing ore from the Julio 1 pit which is the most cost effective to mine and has proven to be very productive leaching material.


--------------------------------------------------------------------------------
                                       20

--------------------------------------------------------------------------------

Preliminary reserve estimates at the Santa Elena project indicates a tonnage of approximately 1.5 to 5 million tons to a depth of 100 meters on the Julio structure. Geologic data further indicates the Julio structure is present at depths of 1,000 to 2,000 meters at a shallow incline. There are five additional structures that have been identified for further evaluation of the Santa Elena Projects lands.

Production was slowed due to COVID 19.

Return flow from the heap leach pad is running from .2 to .5 GPT of solution. At this stage of development, the company expects return from the heap leach pad flow and the activated carbon cell flow to match at 9 liters per second allowing a 24 hour a day, 7 day a week uninterrupted operation at an average of .35 per ton solution.

Three carbon cells are in use with 100% recovery in addition to the final recovery being an electro winning plant to clean the gold from the activated carbon. The electro winning plant takes approximately 30 hours to run 1 ton of material carbon. The company has a complete and operable Merrill Crowe gold recovery plant on site as a back­up.





Mabel Property


Mexus Gold MX, a fully owned subsidiary of Mexus Gold US, is 90% owner of the Mabel Project comprised of approximately 2,128 hectares (5,258 acres) is located approximately 52Km's SW from Nogales, Sonora State, Mexico and 34Km's south of the United States border at Sasabe.

Mexus has decided to continue to validate a Technical Report on the advanced Gold and Porphyry Copper property. Completion of an updated 43­101 Technical Report will include all exploration results since the last 43­101 report which was issued on January 14, 2013. The update report will include high density drilling, geologic mapping, geophysics and a preliminary resource estimate.

The 2013 exploration consisted of more than 700 drill holes, 4000 RC drills and surface samples which were analyzed in several independent laboratories.

Preliminary Resource Estimates from a 5% fraction of the project gave 1.3 million tons of 0.7 g/t Au and 23 g/t Ag including 20% with an average grade of 1.9 g/t Au equivalent. Potential resources at productive shallow depths are expected to be approximately 6,000,000 tons.

There are also surface geological and geophysical anomalies identified which, upon further evaluation and sampling, may present a strong potential for the existence of a porphyry copper target.





Ures Property


Mexus Gold US owns mineral rights to approximately 10,000 acres over 9 concessions near Hermosillo, Mexico. The concessions include the Ocho Hermanos, 370, San Ramon, Plan Osa, Edgar 1, Edgar 2, El Scorpio, Los Laureles, and Eusol. The concessions are located in Sonora State, Mexico approximately 80 KM NE of Hermosillo.

In the past year, Mexus has completed leach VAT testing and trenching including assaying with promising results. Historical assaying of the Ocho Hermanos concession has produced assays up to 1 Kg Ag per ton with 10 Gpt Au, 4% lead and 1% copper. One ton of mineralized materials holds 40 metals which is a complex ore. The Company is evaluating production procedures to economically process this ore.

Mexus has done limited drill hole testing of the Scorpio Project concession with results up to 3% copper, 1.5 Gpt Au, and 60 Gpt Ag.


--------------------------------------------------------------------------------
                                       21

--------------------------------------------------------------------------------

Non-Material Mining Properties

San Felix Mine Project (formerly known as the Mexus-Trinidad Joint Venture)

In March, 2014, we sold our 50% interest in the Joint Venture to Atzek Mineral S.A. de C.V ("Atzek"). Atzek is currently in default of the sale agreement.

Effective January 13, 2017, our wholly owned subsidiary, Mexus Gold Mining, S.A. de C.V., entered into a purchase agreement with Jesus Leopoldo Felix Mazon, Leonardo Elias Jaime Perez, and Elia Lizardi Perez, wherein we purchased a 50% interest in the "San Felix" mining site located in the La Alameda area of Caborca, State of Sonora, Mexico. The remaining 50% of the site is owned jointly by Mar Holdings S.A. de C.V. and Marco Antonio Martinez Mora. The San Felix mining site contains seven (7) concessions over an area of approximately 26,000 acres. During the year ended March 31, 2018, the Company recorded an impairment of mineral property for the San Felix Project of $75,000 because the payment of $500,000 installment due on August 13, 2017 was not executed in accordance with the purchase agreement pending the receipt of certain required instruments from the Grantor by the Company.





Other Operations



Cable Salvage Operation


The Company completed the first phase of its Cable Recovery Project in Alaskan waters. The cable which was recovered was smaller diameter cable which was excellent for testing the recovery equipment and vessels. The Company evaluated the project and conducted a mapping project and exploration activities in an attempt to identify larger cable.

At March 31, 2017, the Company ceased cable salvage operations in order to fully concentrate on Mexico operations.





Mergers and Acquisitions


We will routinely review merger and acquisition opportunities. An appropriate merger and acquisition opportunity must be accretive to the overall value of Mexus Gold US. Our primary focus will be on those opportunities involving precious metal production or near-term production with a secondary focus on other resource-based opportunities. Potential acquisition targets would include private and public companies or individual properties. Although our preference would be for candidates located in the United States and Mexico; Mexus Gold US will consider opportunities located in other countries where the geopolitical risk is acceptable.

Description of Mining Projects

The following properties are located in Mexico and owned by Mexus Gold S.A. de C.V., our wholly owned subsidiary:

Santa Elena Prospects (formerly known as the Caborca Project)

The Company executed a revised Mineral Mining and Purchase Agreement, dated December 3, 2015, with the Concession Owners covering 2,225 acres located in the State of Sonora, Mexico. The Agreement is for a term of 25 years and specifies a purchase privilege, at the discretion of the Company, for all concessions in the amount of $2,000,000 absent the exercise of the purchase privilege a royalty of 40% for lode deposits and 25% for placer deposits and is credited to the purchase price. The Agreement specifies a delayed monthly royalty in the amount of $1,000 and the payment of the semi-annual concession tax.


--------------------------------------------------------------------------------
                                       22

--------------------------------------------------------------------------------





Santa Elena Concessions
                                      AREA
No     CONCESSION NAME    TITLE NO  HECTARE   DATE ISSUED END DATE
 1      MARTHA ELENA       221447   339.3811   10/2/2004  9/2/2054
 2        JULIO II         221448   59.0401    10/2/2004  9/2/2054
 3        JULIO III        231609   99.6381    3/25/2008  3/24/2058
 4        JULIO IV         231610   99.9687    3/25/2008  3/24/2058
 5         JULIO V         231611     100      3/25/2008  3/24/2058
 6        JULIO VI         231612     100      3/25/2008  3/24/2058
 7        JULIO VII        231613     100      3/25/2008  3/24/2058
       Total Hectares               898.028
         Total Acres               2,219.0755



The Company has conducted geological evaluation of the Santa Elena Prospects comprised of expanding the existing placer facility for the purpose of mineral evaluation, physical geological evaluations including the drilling of reverse circulation and core holes. Situated on the prospect area are caterpillars, haul trucks, maintenance trucks, power generators, pumps, tractor blade, truck mounted winch, water handling supplies and maintenance trailer with supplies. The prospect area is accessed from a state highway on existing roads. There is access to well water which is available for the current and future operations.

On January 5, 2011, Mexus Gold Mining S.A. de C.V. entered into a Purchase Agreement to purchase the Santa Elena Prospect, formerly known as the Caborca Project. The Santa Elena Prospect consists of 7,400 acres (3,000 hectares) about 50 kilometers northwest of the City of Caborca, Sonora State, Mexico. The Caborca Project lies on claims filed by the owners of the Santa Elena Ranch, which controls the surface rights over the project claims. The claims lie near 112o 25' W, 31o 7.5" N. These claims were visited near the end of January, 2011. On or about July 11, 2011, we acquired five additional claims surrounding the Santa Elena Prospect consisting of approximately 1,000 additional acres.

We have been unable to locate geologic maps of the area from the Government Geological Survey. However, pursuant to our investigation of the project, the claims were found to be underlain by an igneous complex. The rocks observed included many types of granitic rocks, exhibiting porphyrytic textures, gneissic and equigrannular textures. Quartz was variable. At times quartz "eyes" were observed, that is porphyrytic quartz which many workers consider to be indicative of a porphyry environment. In other localities, no quartz was evident. When no quartz was present, the rock was equigrannular. Quartz veining was evident throughout the claim group. A mine was developed along a major quartz vein, called the Julio 2 Mine with the vein being called the Julio Vein.

There are multiple exploration targets on the Santa Elena Prospect. The two most important are the quartz stockwork zone and the Julio vein system. The first target will be the quartz stockwork zone area. A limited drilling program has been conducted and completed. Production testing has been completed resulting in the construction of the surface production and recovery facilities.

Access to the Santa Elena prospect is via dirt road approximately two miles west of paved highway Mexico 1 and approximately 34 miles northwest of the town of Caborca, Sonora, Mexico.


--------------------------------------------------------------------------------
                                       23

--------------------------------------------------------------------------------

                          [[Image Removed: Picture]]



                  FIGURE 1 - SANTA ELENA PROJECT LOCATION MAP

--------------------------------------------------------------------------------
                                       24

--------------------------------------------------------------------------------

                           [Please see Exhibit 99.1]



           Exhibit 99.1 - PRELIMINARY REPORT AND FIRST STAGE MAPPING


Ures Property Prospects, being comprised of the following projects:

Ocho Hermanos - Guadalupe de Ures Project

The Guadalupe de Ures Project is accessed from Hermosillo by driving via good paved road for 60 kilometers to the town of Guadalupe de Ures and then for 15 kilometers over dirt roads to the prospects. A base camp has been established near the town of Guadalupe de Ures using mainly trailers for accommodation, workshops and kitchen facilities.







                          [[Image Removed: Picture]]



               FIGURE 2 - GUADALUPE DE URES PROJECT LOCATION MAP

--------------------------------------------------------------------------------
                                       25

--------------------------------------------------------------------------------

The Ocho Hermanos Project (also called the Guadalupe de Ures Project) consists of the "Ocho Hermanos" and "San Ramon" claims which are covered by the Sales and Production Contract dated the 4th day of July, 2009 between "Minerales Ruta Dorado de RL de CV" (seller) and "Mexus Gold Mining S.A. de C.V.", a wholly owned subsidiary of Mexus Gold US (buyer). The Ocho Hermanos Claim consists of 34.9940 hectares (1 acre = 0.4047 hectares) or 86.4690 acres while the San Ramon Claim consists of 80 hectares (197.6773 acres).(Figure 4).

The initial term of the agreement was 5 years. During the term Mexus must pay 40% of the net revenue received for minerals produced to the seller. At the conclusion of the 5 years, the lease could be purchased for USD 50,000. Upon expiration on July 4, 2014, Mexus renewed the agreement with an indefinite term. The renewed agreement requires Mexus to pay $1,500 per month and 20% to the total proceeds upon a sale of the rights.

Minerales Ruta Dorado de RL de CV is a duly constituted Mexican Company and as such can hold mining claims in Mexico.





                          [[Image Removed: Picture]]

                            FIGURE 3 - OCHO HERMANOS

                             PROJECT AREA CLAIM MAP


We did not perform any systematic sampling or any systematic drilling and because of this did not set up a formal QA/QC program. All of the samples were submitted to Certified Laboratories (ALS - Chemex in Hermosillo or American Assay in Reno, Nevada) which insert their own QA/QC samples/duplicates. Also the laboratories run duplicates and blanks from each batch fired. The sequence of events so far is the following:

We located a previously mined area with interesting values - Ocho Hermanos. Mexus began to submit characterization samples to the above noted assay laboratories, in order to determine the range of Au - Ag values

--------------------------------------------------------------------------------


                                       26

--------------------------------------------------------------------------------

present. Mexus then began an investigation into recovery options by using material taken from the areas with the better values.

The above work was completed before any systematic exploration was done because if no recovery method could be found relatively quickly, the project would move more slowly because of the lead time involved. Mexus began work on an Environmental Impact Statement for the likely operational area (a total of 4 hectares to begin). In order to complete the EIS, figures for estimated tonnages for volume were submitted. To date, no suitable recovery method has been identified due primarily to the partial oxidation of the principally sulfide deposit.

The Environmental Permits run for 35 years so there is time for further investigation.

The main geologic feature of this project area is an apparent "manto" sulfide zone composed primarily of galena with some pyrite, arsenopyrite and possibly pyrrhotite. Above this zone there is an oxide zone composed of iron and lead oxides. The sulfides themselves are partially oxidized. Reconnaissance and characterization samples taken indicated sporadically high gold and silver values. The deposit occurs in shallow water sediments (principally quartzites, with some limestone and shales) and can be best characterized as a skarn type deposit due to the presence of intrusive rocks within 1 kilometer.

Given the complex nature of the sulfide deposit and the partial oxidization of the material (indicated by the presence of yellow colored lead oxides), a satisfactory recovery method has not yet been found. Consequently, at this time, no further systematic work beyond the initial reconnaissance and characterization sampling has been completed. The entire project was essentially put on hold until a suitable recovery method is found, which is a continuing effort and at this time is being pursued by a member of the faculty at the University of Sonora in Hermosillo. The faculty member teaches metallurgy and assay practices at the University. After a suitable recovery method has been identified, the process will need to be confirmed by a certified metallurgical testing laboratory.

The Environmental Permits detail all of the affected flora and fauna. The land is presently used for cattle grazing and the surface rights are owned by the community of Guadalupe de Ures. An agreement is in place with Mexus Gold Mining S.A. de C.V. for surface access and disturbance. The Environmental Permit concludes that no permanent damage or degradation of the present land use will result from the intended activity on the lands. At present, the Environmental Permits cover a total of 4 hectares - 3 hectares cover the initial site of the mineral as presently understood and 1 hectare is permitted for the erection of a suitable extraction plant.

No known contamination from past mining activities was found or is known to locals. The historic workings consisted of a few shallow adits and pits. In the course of obtaining the Environmental Permission the permit stipulated that properly lined ponds etc. must be used to prevent any potential surface or ground water contamination from any proposed activities.

Only separation is proposed to be conducted on site if found to be possible, while final metal recovery will be conducted at a properly licensed and certified metal refining facility. Current efforts to find suitable recovery methods are being conducted off site in a University laboratory. Up sizing the process, if found, will be completed by a licensed, certified metallurgical laboratory.

Figures of the proposed permitted sites are attached. These were extracted from the environmental permit

Application.

--------------------------------------------------------------------------------


                                       27

--------------------------------------------------------------------------------

[[Image Removed: Picture]]

FIGURE 4- MICROLOCALIZACION PROYECTO "URES MINING DISTRICT"

--------------------------------------------------------------------------------


                                       28

--------------------------------------------------------------------------------



                          [[Image Removed: Picture]]



                 FIGURE 5 - LOCALIZACION DE AREAS DE EXTRACCION



                          [[Image Removed: Picture]]

                         FIGURE 6 - PLANTA DE BENEFICIO

                               AREA DE EXTRACCION



370 Area Project

This zone is composed of a sedimentary sequence (limestone, quartzite, shale) intruded by dacite and diorite as well as rhyolite. The dacite exhibits argillic alterations as well as silicification (quartz veins). The entire area is well oxidized on the surface. This is an area of classic disseminated low grade gold and silver mineralization. Surface grab sample assays show 0.14 grams per ton to as high as 29.490 grams per ton gold. This area is an important area for potentially defining an open pit heap leach project.


--------------------------------------------------------------------------------
                                       29

--------------------------------------------------------------------------------



El Scorpion Project Area


This area has several shear zones and veins which show copper and gold mineralization. Recent assays of an 84' drill hole shows 1.750% per ton to .750% per ton of copper and 3.971 grams per ton to 0.072 grams per ton of gold. Another assay of rock sample from the area shows greater than 4.690% per ton copper. This land form distribution appears to be synonymous to the ideal porphyry deposit at Baja La Alumbrera, Argentina.

Los Laureles

Los Laureles is a vein type deposit mainly gold with some silver and copper. Recent assays from grab samples show gold values of 67.730 grams per ton gold, 38.4 grams per ton silver, 2,800 grams per ton copper.

As of the date of this Report, we have opened up old workings at the Los Laureles claim and have discovered a gold carrying vein running north and south into the mountain to the south.

The San Felix Mine Project

The San Felix mining site contains seven (7) concessions over an area of approximately 26,000 acres located in the La Alameda area of Caborca, Sonora, Mexico. During the year ended March 31, 2018, the Company recorded an impairment of mineral property for the San Felix Project of $75,000 because the requirement payment of $500,000 due on August 13, 2017 was not paid in accordance with the purchase agreement pending the receipt of certain required instruments from the Grantor by the Company.





Employees


We have one employee, Paul D. Thompson, and no other employees at this time in the United States of Mexico. Consultants with specific skills are utilized to assist with various aspects of the requirements of activities such as project evaluation, property management, due diligence, acquisition initiatives, corporate governance and property management. If we complete our planned activation of the operations of the Mexican mining properties, our total workforce will be approximately 20 persons. Mr. Paul D. Thompson is our sole officer and director.





Competition


We compete with other mining companies in connection with the acquisition of gold properties. There is competition for the limited number of gold acquisition opportunities, some of which is with companies having substantially greater financial resources than Mexus Gold US. As a result, Mexus Gold US may have difficulty acquiring attractive gold projects at reasonable prices.

Management of Mexus Gold US believes that no single company has sufficient market power to affect the price or supply of gold in the world market.





Legal Proceedings


There are no legal proceedings to which Mexus Gold US or Mexus Gold S.A. de C.V. is a party or of which any of our properties are the subject thereof.

Property Interests, Mining Claims and Risk

Property Interests and Mining Claims

Our exploration activities and operations in Mexico are subject to the rules and regulations of the United Mexican States. The Ministry (Secretariat) of Mining is the Federal Mexican Government ministry charged with controlling all mining matters. A concession is granted on the acceptance of an application which identifies the specific minerals to be mined and description of the exact location of the lands to be mined. The concession is subject to a semiannual tax to continue the concession in good standing. Usually, our arrangements with a concessionaire describe specific period payments to the concessionaire and a royalty on the minerals recovered from mining operations. Where prospective mineral properties are identified by the Company, some type of conveyance of the mining rights and


--------------------------------------------------------------------------------
                                       30

--------------------------------------------------------------------------------

property acquisition agreement is necessary in order for us to explore or develop such property. Generally, these agreements take the form of long term mineral leases under which we acquire the right to explore and develop the property in exchange for periodic cash payments during the exploration and development phase and a royalty, usually expressed as a percentage of gross production or net profits derived from the leased properties if and when mines on the properties are brought into production. Other forms of acquisition agreements are exploration agreements coupled with options to purchase and joint venture agreements.





Reclamation


We may be required to mitigate long-term environmental impacts by stabilizing, contouring, re-sloping and re-vegetating various portions of a site after mining and mineral processing operations are completed. These reclamation efforts will be conducted in accordance with detailed plans, which must be reviewed and approved by the appropriate regulatory agencies.

While the Company, as of June 30, 2022, does not have a legal obligation associated with the disposal of certain chemicals used in its leaching process, the Company estimates it will incur costs up to $50,000 to neutralize those chemicals at the close of the leaching pond.





Risk


Our success depends on our ability to recover precious metals, process them, and successfully sell them for more than the cost of production. The success of this process depends on the market prices of metals in relation to our costs of production. We may not always be able to generate a profit on the sale of gold or other minerals because we can only maintain a level of control over our costs and have no ability to control the market prices. The total cash costs of production at any location are frequently subject to great variation from year to year as a result of a number of factors, such as the changing composition of ore grade or mineralized material production, and metallurgy and exploration activities in response to the physical shape and location of the ore body or deposit. In addition costs are affected by the price of commodities, such as fuel and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production at certain operations less profitable. A material increase in production costs or a decrease in the price of gold or other minerals could adversely affect our ability to earn a profit on the sale of gold or other minerals. Our success depends on our ability to produce sufficient quantities of precious metals to recover our investment and operating costs.

Distribution Methods of the Products

The end product of our operations will usually be doré bars. Doré is an alloy consisting of gold, silver and other precious metals. Doré is sent to refiners to produce bullion that meets the required market standard of 99.95% pure gold. Under the terms of refining agreements, the doré bars are refined for a fee and our share of the refined product is delivered to a buyer for immediate sale or held by the Company for investment purposes.

General Market

The general market for gold has two principal categories, being fabrication and investment. Fabricated gold has a variety of end uses, including jewelry, electronics, dentistry, industrial and decorative uses, medals, medallions and official coins. Gold investors buy gold bullion, official coins and jewelry. The supply of gold consists of a combination of current production from mining and the draw-down of existing stocks of gold held by governments, financial institutions, industrial organizations and private individuals.

Patents, trademarks, licenses, franchises, concessions, royalty agreements, or labor contracts, including duration;

We do not have any designs or equipment which is copyrighted, trademarked or patented.

--------------------------------------------------------------------------------


                                       31

--------------------------------------------------------------------------------

Effect of existing or probable governmental regulations on the business





Government Regulation


Mining operations and exploration activities in Mexico are subject to the Ministry of Mining federal laws and regulations which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances and other matters. We have obtained or have pending applications for those licenses, permits or other authorizations currently required to conduct our exploration and other programs. We believe that Mexus Gold US is in compliance in all material respects with applicable mining, health, safety and environmental statutes and the regulations passed thereunder any jurisdiction in which we will operate. We are not aware of any current orders or directions relating to Mexus Gold US with respect to the foregoing laws and regulations.





Environmental Regulation


Our gold projects are subject to various Mexican federal laws and regulations governing protection of the environment. These laws are continually changing and, in general, are becoming more restrictive. It is our policy to conduct business in a way that safeguards public health and the environment. We believe that the actions and operations of Mexus Gold US will be conducted in material compliance with applicable laws and regulations. Changes to current Mexican federal laws and regulations where we operate currently, or in jurisdictions where we may operate in the future, could require additional capital expenditures and increased operating and/or reclamation costs. Although we are unable to predict what additional legislation, if any, might be proposed or enacted, additional regulatory requirements could impact the economics of our projects.





Research and Development



We do not foresee any immediate future research and development costs.

Costs and effects of compliance with environmental laws

Our gold projects are subject to various federal and state laws and regulations governing protection of the environment. These laws are continually changing and, in general, are becoming more restrictive. It is our policy to conduct business in a way that safeguards public health and the environment. We believe that our operations are and will be conducted in material compliance with applicable laws and regulations. The economics of our current projects consider the costs and expenses associated with our compliance policy.

Changes to current state or federal laws and regulations in Mexico, where we operate currently, or in jurisdictions where we may operate in the future, could require additional capital expenditures and increased operating and/or reclamation costs. Although we are unable to predict what additional legislation, if any, might be proposed or enacted, additional regulatory requirements could impact the economics of our projects.





Results of Operations


The following management's discussion and analysis of operating results and financial condition of Mexus Gold US is for the three months ended June 30, 2022 and 2021. All amounts herein are in U.S. dollars.

Three months ended June 30, 2022 Compared with the Three Months Ended June 30, 2021

We had a net loss during the three months ended June 30, 2022 of $350,319 compared to a net loss of $829,506 during the same period in 2021. The decrease in net loss is primarily attributable (i) a decrease in exploration costs of $42,581 (ii) a decrease in stock-based compensation - consulting services of $343,524 (iii) a decrease in interest expense of $92,905 (iv) a decrease in general and administration expense of $9,657 (v) a decrease in the loss on settlement of debt of $5,533 and (vi) an increase in gain on the sale of equipment of $70,970. The decrease in the net loss is partially offset by an decrease in gain on the change in the fair value of and settlement of convertible promissory notes and derivative liabilities of $66,078 and (ii) a decrease in the sale of gold of $19,949.


--------------------------------------------------------------------------------
                                       32

--------------------------------------------------------------------------------



Operating Expenses


Total operating expenses decreased to $265,450 for three months ended June 30, 2022, compared to $641,263 for the three months ended June 30, 2021. The decrease in operating expenses was primarily due to a decrease in stock-based expense - consulting services,

For the three months ended June 30, 2022, the Company had recoveries from the sale of gold of $0 compared to $19,949 for the three months ended June 30, 2021. Sales of gold are reported as a reduction of exploration expense in the consolidated statement of operations since the Company is in the exploration stage.





Other Income (Expense)



We reported $84,869 of other expense during the three months ended June 30, 2022 compared to $188,243 of other income during the same period in 2021.

The change in other income (expense) is mainly attributable to a decrease in the gain on the change in the fair value of and settlement of convertible promissory notes and derivative liabilities and a decrease in interest expense.

Liquidity and Capital Resources

On June 30, 2022, we had cash of $24,032 compared to cash of $7,174 on March 31, 2022.

Our property and equipment increased to $345,490 on June 30, 2022, compared to $221,457 at March 31, 2022. The increase in equipment is due to the purchase of equipment of $150,000, sale of equipment of $75,970, gain on sale of equipment of 70,970 and depreciation expense of $20,966 during the three months ended June 30, 2022.

Our mineral properties remained unchanged at $829,947 on June 30, 2022 and March 31, 2022

Total assets increased to $1,199,469 on June 30, 2022, compared to $1,058,578 on March 31, 2022. The majority of the increase in assets relates to the purchase of equipment of $150,000, sale of equipment of $75,970, gain on sale of equipment of 70,970 and depreciation expense of $20,699 and increase in cash of $16,858.

Our total liabilities increased to $2,817,969 as of June 30, 2022, compared to $2,802,972 as of March 31, 2022. The increase in our total liabilities can be primarily attributed to an increase in accounts payable and promissory notes payable.

Our working capital deficit on June 30, 2022 and March 31, 2022 is $2,793,937 and $2,795,798, respectively.

Our net cash used in operating activities for the three months ended June 30, 2022 and 2021 is $169,112 and $170,898, respectively. Our net loss for the three months ended June 30, 2022 of $350,319 was the main contributing factor for our negative cash flow offset mainly by depreciation and amortization of $20,966, loss on settlement of debt and accounts payable of $16,028, stock-based compensation - consulting services of $32,236 and non-cash interest expense of $166,743.

Our net cash (used in) provided by investing activities for the three months ended June 30, 2022 and 2021 is $75,970 and $0, respectively.

Our net cash provided by financing activities for the three months ended June 30, 2022 and 2021 is $110,000 and $196,500, respectively, mainly due to issuance of convertible promissory notes and common stock.

The Company is dependent upon outside financing to continue operations. It is management's plans to raise necessary funds through a private placement of its common stock to satisfy the capital requirements of the Company's business plan. There is no assurance that the Company will be able to raise the necessary funds, or that if it is successful in raising the necessary funds, that the Company will successfully execute its business plan. The Company is unable to predict the effect, if any, that the coronavirus COVID-19 global pandemic may have on its access to the financing markets.


--------------------------------------------------------------------------------
                                       33

--------------------------------------------------------------------------------

Going concern

The accompanying consolidated financial statements have been prepared assuming the Company will continue as a going concern, which contemplates the realization of assets and satisfaction of liabilities in the normal course of business.

During the three months ended June 30, 2022, the Company incurred a net loss of $350,319 and used cash in operating activities of $169,112, and on June 30, 2022, had an accumulated deficit of $38,608,811. On June 30, 2022, the Company is in the exploration stage. These factors, among others, raise substantial doubt about the Company's ability to continue as a going concern within one year of the date that the financial statements are issued. The Company's independent registered public accounting firm, in their report on the Company's financial statements for the year ending March 31, 2022, expressed substantial doubt about the Company's ability to continue as a going concern.

The Company is dependent upon outside financing to continue operations. The financial statements do not include any adjustments that might result from the outcome of this uncertainty. It is management's plans to raise necessary funds through a private placement of its common stock to satisfy the capital requirements of the Company's business plan. There is no assurance that the Company will be able to raise the necessary funds, or that if it is successful in raising the necessary funds, that the Company will successfully execute its business plan. The Company is unable to predict the effect, if any, that the coronavirus COVID-19 global pandemic may have on its access to the financing markets.

The consolidated financial statements do not include any adjustments relating to the recoverability and classification of assets and/or liabilities that might be necessary should the Company be unable to continue as a going concern. The continuation as a going concern is dependent upon the ability of the Company to meet our obligations on a timely basis, and, ultimately to attain profitability.







Future goals


The Santa Elena Prospect (formerly known as Caborca Properties) has become our primary focus. The completion of the initial surface ground construction for a leaching production plant, being an expandable ore leaching pad, solution ponds and production recovery facility, has been tested and will be placed into production. The ore leaching pad has 35,000 tons of ore in place and will be increased in size on a continuing basis to realize the capacity of the production facility.

Therefore, our goal for the current year is to increase the cash flow of the Company's operations through (a) place the current facilities into full commercial production, (b) increase the mineralization of the ore pad from 1 gram per ton gold and 3 grams per ton silver and (c) increase the capacity of the leach pad.

The Company has now scheduled the installation of a crushing/milling recovery plant for the high grade Julio quartz deposit as a result of the values of the assay analysis from the deposit which range from .250 to 5.5 ounces of gold per ton.

Therefore, our goal for the current year is to increase the cash flow of the placer mining operation, continue the drilling program which began during 2011, initialize mining operations on the Julio quartz deposit while we conduct a thorough geological study by an independent geological firm of the future potential of other vein deposits located near the Julio deposit.

Foreign Currency Transactions

The majority of our operations are located in United States and most of our transactions are in the local currency. We plan to continue exploration activities in Mexico and therefore we will be exposed to exchange rate fluctuations. We do not trade in hedging instruments and a significant change in the foreign exchange rate between the United States Dollar and Mexican Peso could have a material adverse effect on our business, financial condition and results of operations.

--------------------------------------------------------------------------------


                                       34

--------------------------------------------------------------------------------

Off-balance Sheet Arrangements

The Company does not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on the Company's financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to investors.