Date: 30'" January, 2017
Ref No.: MPL/CB03/FIC0/317
:J r d F loo r, Mit t 11! Tu wer, B wing, Narim un Point , Mumbai 11 00021 , India. GIN : U11102Mll2007PI.C1 70562
Toi | , 9 1 | 2 2 | 4 0 3 73333 |
Toi | • 9 1 | 2 2 | 663 7 3333 |
lax : | , 9 1 | 2 2 | 6 6 3 7 3344 |
Wobsi te : www.nrnrca tu1.in [.mail 1norc11tor@morcator.in
To,
Regional Office Western Region,
Kendriya Paryavaran Bhavan, Link Road No.3,
E-5, Ravi Shankar Nagar, Bhopal - 462016(MP) Telefax: 0755-2465054
Sub: Status of the compliance of the stipulated environmental conditions.
Ref: Environmental clearance ("EC") bearing reference no J-11011/28/2011-IA II (I) granted for Block CB ONN-2005/3 ("Block") Exploratory Drilling (Onshore) for Oil and Gas (8 wells) in Districts Ahmedabad and Mehsana.
Dear Sir/Madam,
We, Mercator Petroleum Limited (MPL) refer to the aforementioned EC and pursuant thereto; enclose a report (along with supporting annexures) on the status of the compliance of the stipulated environmental conditions.
We request you to acknowledge receipt of the same in good order.
Thanking You, Yours Sincerely,
% y
Dr. fastia MC Member
Cc - 1. Central Pollution Control Board, Parivesh Bhavan, Opp. VMC ward office no.1, Subhanpura Vadodara - 390023
2. Gram Nirman Bhavan, Khadi Gramodhyog Board Building, 2°d Fir, Juna Vadaj, Ahmedabad - 380013
3. H/3 - A, Phase -1,GIDC Office, Modhera Rd, Mehsana - 389002
Subject: EC compliance Report (February to December, 2015), EC NO: F. No. J 11011/28/2011- IA II (I) for on-shore exploratory drilling 8 wells in Oil and Gas Block CB-ONN-2005/3 in District Ahmadabad and Mehsana, Gujarat,
-S-.No.
1········-·Con·ditions of Environmental Clearance ·r .. .. ..... ...... ... - Compli-a nce _ -- - ----·-· ----·-·--"·-----·-
-
(A) Specific Conditions ·
------ . ···- - ·---····· -------·-- -·--·-----------··· -------.
I This EC is only for exploratory drilling. In case Noted.
development drilling to be done in future, prior cleara nee must be obtained from concerned authorities.
f---·
"
Ambient air quality monitored near closest human settlements as per the National Air Quality Emission standards issued by the Minis!ry vide G.S.R. No. 826 (E) dated 161
No drilling activity during the aforementioned reporting period (July to December, 2016).
November 2009, for PM10, PM2.5, S02,NOx,CO,methane and Non - Methane HC
!--------..- ··-·--··-
Mercury shall also be analyzed in air, water
--·-a-·n-·d· drilI cuttings twice during drillin.9_p_eriod ·····-------·--- · ·---·----- ivApproa ch road shall be made pucca to Complied
minimi,z,__e_generation of su_i;pended dust. ·- _ _ -·------ ----_ __ vThe company shall make the arrangements for No drilling activity during the aforementioned
control of noise from drilling activity. Acoustic reporting period (July to December, 2016). enclosure shall be provided DG sets and
proper
stack height shall be provided as per
·-C---P- CB_guicJ_eline_s _ ...... .. _
vi Total
water requirement shall not exceed 20
m3 Iday and prior permission shall be obtained
---- from the concerned agency. _ _
The company shall construct the garland drain
all around the drill site to prevent runoff of any oil containing waste into the nearby water
bodies.
created
Separate drainage system shall be for oil contaminated and non oil
contaminated. Effluent shall be properly treated and treated wastewater shall conform to CPCB standards
·-·---·------- · -j
Drilling wastewater including drill cuttings
Oncompletion of drilling, the company has to plug the drilled wells safely and obtain certificate from environment safety angle from the concerned authoritf
Blow Out Preventor (BOP) system shall be
The company shall take measures after No drilling activity during the aforementioned completion of drilling process by well plugging reporting period (July to December, 2016). and secured enclosures, decommissioning of
rig upon abandonment of the well and drilling site shall be restored to the original condition. In the event that no economic quantity of hydrocarbon is found a full abandonment plan
shall be
implemented for the drilling site in
accordance with the applicable Indian Petroleum Requlations. -
Abandone d well inventory and remediation
plan shalI be submitted within six months from the date of issue of letter.
/)
Occupational health surveillance of the workers shall be carried out as per prevailing
·-- Acts and rules.
•.. ·.
2
S.No.
xx
COnditions cif EOVfronm·e"rli aT-C1earan·c-e --- ------In case the commercial viability of the project Noted is established, the Company shall prepare a
detailed plan for development of oil and gas fields and obtain fresh environmental clearance from the Ministry.
Compliance
---·--+-----·-- ·---·- --·-..··-..-···-·-·-- --·--- - --,-....,,_ - ·----·--..-·-------·-·-· ----- . . ,, . ·- --·-··-··-· ··-···-·---·-...,,....-··-
Restoration of the project site shall be carried Restoration of site will be done as per norm
out satisfactorily and report shall be sent lo the once work is fully completed.
'----, Ministry's Regional O_ffice at BhopaJ _,_ _
--· --- ----- _ _ _ _ _
Oil content in the drill cuttings shall be No drilling activity during the aforementioned monitored by some Authorized agency and reporting period (July to December, 2016). report shall be sent to the Ministry's Regional
Office at Bhooal.
xxiii Under Enterprise -Social Commitment (ESC), - Compan y-providesadeq-uate-iund_s under Sufficient budgetary provision shall be made CSR (ESC).
for health improvement, education, water and
,----+--e_lectricity supply etc._i11_and ."':ound the_ proiect xxiv An audit shall be done to ensure that the
Environment Management Plan is implemented in totality and report shall be
Audit is being planned.
----l:lt11iUead to the Ministry's Regional Officea_. _ _ _ _ ----------·------- xxv A social audit shall be carried out for the whole Noted
operation area with the help of reputed
Institute like Madras Institute of Social Sciences etc.
f----- -j---
xxvi All personnel including those of contractors
shall be trained and made fully aware of the
----- ------..---··-·· ---
Complied. However no drilling activity was
carried out during reporting period.
hazards, risks and controls in place_.
··----- ---
Company must have own Environment HSSE set up is functional in the company to Management Cell having qualified persons carry out these functions.
with proper background ·-cc- --- ---1-:- ----c---c-==--:c- ----------
Company shall prepare operating manual in Company has HSSE Management system
respect of all activities. It shall cover all safety and it is being followed. Beside, MOEF
& environment related issues and system. approved EIA report is available and Measures to be taken for protection. One set environmental protection measures of environmental manual should be made suggested in this report are being adhered available at the drilling site/ project site. to.
Awareness should be created at each level of the management. All the schedules and results of environmental monitoring should be
·-·- _
__ _availablE,_at the project _siteoffic e ----
The project authorities must strictly adhere to the stipulations made by the Gujarat Pollution Control Board (GPCB), state Government and any other statutory authority.
Being adhered to as applicable
No further expansion or modification - in-tF,e Noted-------,,-··-
project shall be carried out without prior approval of the Ministry of Environment & Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental
3
wash water shall be collected in disposal pit linedwith HOPE lining evaporated or treated and shall comply with the notified standards for on-shore disposal. The membership of common TSDF shall be obtained for the disposal of drill cuttings and hazardous waste.
Otherwise, secured land fill shall be created as per the design approved by the CPCB and obtain authorization from the SPCB. Copy of authorization or membership of TSDF shall be submit!ed to Ministry's Regional Office at
··-· BhclJJal ix Good sanitation facility should be provided at
the drilling site. Domestic sewage shall be disposed off through septic tank I soak pit.
---- ---- --- ..,.,. ------------
S.No. Condi
-··---· --····-- --- ··--····----- - ----------·..--···
!ions of Environmental Clearancex Oil spillage prevention scheme shall be No drilling activity during the aforementioned
prepared
In case of oil spillage I reporting period (July to December, 2016).
contamination. action plan shall be prepared
to clean
the site by adopting proven
technology. The recyclable waste (oily sludge) and spent oil shall be disposed to theauthorizedrecyglers
The company shall comply with the guidelines fordisposal of solid waste; drill cutting and drillingfluids for onshore drilling operation notified vide GSR. 546(E) dated 30th August, 2005.
-- The - Co m-pany shall take necessary measures
to prevent fire hazards, containing oil spill and soil remediation as needed. Possibility of using ground flare shall be explored. At the place of ground flaring, the overhead flaring stack with knockout drums shall be installed to minimize gaseol!§__,,_missions durin_g gpEl_ration.
xiii The company shall develop a contingency
plan for
aspects
H2S release including all necessary from evacuation to resumption of
normal operations. The workers shall be
provided
with personal H2S detectors in
locations of high risk of exposure along with
self containing breathing apparatus.
installed
to prevent well blow outs during
drilling operations. BOP measures during
drilling shall focus on maintaining well bore hydrostatic pressure by proper pre-well planning and drilli_rig fluid logging etc.
xvi Emergency Response Plan (ERP) shall be Emergency plan was in place. based on the guidelines by OISD, DGMS and
Govt. of India.
Mercator Lines Limited published this content on 31 January 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 31 January 2017 05:59:16 UTC.
Original documenthttp://mercator.in/news/Cb3 2017.pdf
Public permalinkhttp://www.publicnow.com/view/575E40C95D0B95D598B326E472AD2F5B5C3D038F