Quarterly Activities Summary For Period Ended 31st December 2011Highlights
Rig contract awarded for ENSCO-109 jack-up to drill Heron-3 in 2012
WA-360-P participating interest to increase to 62.5% prior to permit renewal Acquisition of 1,318 km2 multi-client Zeus 3D survey completed (covers WA-361-P) Eni acquires 766 km2 Bathurst 3D seismic survey in NT/P68 over Blackwood East Completed acquisition of 708 km2 Ibu Horst 3D seismic survey in Seruway PSC Regained 100% unencumbered interest in Tassie Shoal Methanol Project
Head office relocated to Level 23, 500 Collins Street, Melbourne
Consolidated cash balance at 31st December A$83.7 million ($0.155/share)
MELBOURNE, AUSTRALIA (23rd January, 2012)MEO Australia Limited (ASX: MEO; OTC: MEOAY) provides the following information in relation to its activities for the quarter ended 31st December 2011.
Executive Summary
MEO commenced a period of high field activity during the
quarter and made significant progress in all areas of its
portfolio.
In NT/P68, Operator Eni Australia Limited ("Eni") awarded a
rig contract for the drilling of the Heron-3 appraisal well.
The rig is expected to arrive late in the second quarter this
year, with drilling to occur during the third quarter. Eni
also brought forward the exercise of their 3D seismic option
and acquired some 766 km2 of 3D seismic data
over the eastern extension of the Blackwood gas discovery.
Acquisition of this survey was
completed in early January and the survey will now undergo
extensive processing to a pre-stack depth migrated volume to
resolve depth conversion challenges. The final processed
volume is expected in November.
Our Tassie Shoal Gas Processing Projects entered a new phase
during the quarter with the appointment of Mr Robert Zammit
to a new position of Executive Manager - Business
Development. His primary role is to drive the Company's
efforts to monetise the Tassie Shoal projects. We terminated
the Joint Development Agreement (JDA) with Air Products which
had been suspended since 2006 and regained a 100%
unencumbered interest in all components of this project,
materially enhancing our commercialization options.
Concurrent with terminating the JDA, we announced our
intention to seek expressions of interest from companies
seeking to participate in these projects. We are confident
that this year will see significant progress in finally
moving these projects towards commercial reality.
Work on MEO's Carnarvon basin permits continued with the
acquisition of 3D seismic in WA-361-P and the submission of a
renewal application for WA-360-P. Two of our WA-360-P joint
venture partners - Petrobras and Moby - have elected to
withdraw at the expiry of the current permit year. The
WA-360-P renewal application includes the proposed purchase
of existing multi-client 3D seismic in the first year. Our
plans for both these permits involve maturing several leads
into prospects before seeking a farm-in partner for either or
both of the permits.
MEO Australia Limited - Quarterly Report 1
Since we were awarded the WA-454-P in the Bonaparte Gulf in
June 2011, we have moved rapidly to assess the potential of
the permit. A technical evaluation of the Marina-1 gas and
liquids discovery has provided sufficient encouragement to
warrant an early investment in 3D seismic. The nearby
Breakwater prospect represents a very attractive exploration
target. Design of and tendering for the Floyd 3D seismic
survey targeting Marina, Breakwater and two other leads was
completed during the quarter and the contract for acquisition
of the Floyd 3D seismic survey was awarded in early January.
Acquisition is expected to commence in February and be
completed in March.
In our contiguous AC/P50, 51 and 53 exploration permits in
the Vulcan sub-basin, we completed design and tendering of
the Zeppelin 2D and 3D seismic surveys during the quarter. A
contract for the 2D and 3D Zeppelin seismic surveys was
awarded in January. The surveys were combined with the Floyd
contract for efficiency and cost reasons.
In Indonesia, acquisition of the 708 km2 Ibu
Horst 3D seismic survey commenced and was completed in early
January. This survey will provide the technical basis to
evaluate the exploration potential of the Ibu Horst section
of the block. We will use this evaluation to select a
candidate for drilling the commitment well due by the end
of
2012. In addition, MEO is working on a variety of activities
aimed at maturing a Plan of Development (POD) for the Gurame
gas discovery within the Seruway PSC. This POD maturation,
coupled with the Kuala Langsa discovery and the improved
definition of the Ibu Horst exploration prospects will
underpin our future plans to attract a farm-in partner for
the Seruway block.
The last quarter also saw MEO's subsidiary South Madura
Exploration Company (SMEC) acquire an additional
60% interest and operatorship (subject to regulatory
approval) in the South Madura PSC from AED South Madura BV
(AED). AED's parent company went into administration and
subsequently receivership in the last half of 2011 which had
the unfortunate effect of suspending progress of the work
program in the block. MEO decided to acquire the increased
interest in the South Madura block from AED's new owners to
drive exploration efforts and we are now focused on
discussions with the Indonesian regulator aimed at arriving
at an achievable work program designed to test the
exploration concepts our technical team has identified.
In November the Company relocated its head office to Level 23, 500 Collins Street Melbourne.
Cash balance at end of quarterAt 31st December 2011, the consolidated cash balance was A$83.75 million equivalent to $0.155/share. The cash balance includes $23.25 million held in US dollars.
Share buy-back
On 28th September, MEO announced it intended to
initiate an on-market share buy-back for up to 10% of its
issued capital following a period during which its shares
traded at below cash backing. The share buy-back allows for
the purchase of up to 47.7 million shares over a 12 month
period commencing on/about 13th October.
No shares were purchased during the quarter under this
initiative which lapsed on 13th December.
Regulatory approval for renewal of WA-360-P for further 5
years
Flawless execution of seismic acquisition programs in AC/P50,
AC/P51, AC/P53 and WA-454-P Evaluate fast-track cube of Ibu
Horst 3D seismic in Seruway PSC
Continue planning for drilling Seruway PSC commitment well in
late 2012
Achieve regulatory approval for increased interest and work
program variation in South Madura PSC Continue to advance
Tassie Shoal gas projects towards commercial development
Continue to seek attractive New Venture opportunities to
supplement acreage portfolio
Jürgen Hendrich
MEO Australia Limited - Quarterly Report 2
Timor Sea: Bonaparte Basin
NT/P68 (MEO 50%1, Eni Australia Ltd 50% & Operator)
Eni is earning an initial 50% interest in the Heron area by
funding the Heron-3 and Heron-4 wells. Eni also has an option
to earn a 50% interest in the Blackwood area by acquiring
a
minimum 500 km2 of 3D seismic and drilling
Blackwood-2 (refer ASX release 18th May
2011).
During the quarter, Eni awarded a contract to Ensco Australia
Pty Limited ("Ensco") for the provision of the ENSCO-109
jack-up drilling rig and associated services to drill Heron-3
which is designed to test the Heron South fault block. The
rig is now expected to become available
late 2nd quarter 2012.
Blackwood 3D
Seismic Survey
498 km2 (2008)
Bathurst 3D Seismic Survey
698 km2
Evans Shoal 3D
Seismic Survey
Eni also acquired the Bathurst 3D seismic survey over
Blackwood East. A total of 766 km2 of full fold
data was acquired, exceeding the 500 km2 minimum
requirement under the farm-in agreement. The survey was
completed in early January. Eni has
365 days from the completion of the survey to elect whether
or not to drill Blackwood-2 to fully earn its 50% interest in
the Blackwood area.
Epenarra 3D Seismic Survey
500 km2 (2006)
Figure 1. Location Map - NT/P68 Exploration Permit showing nearby gas fields and 3D
seismic surveys.
Figure 2. Heron Cross Section.
Work Activity Schedule: NT/P68Permit NT/P68
MEO PI 50%
2011 2012 2013
Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator Eni Australia J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Work program undertakings
Activities
Historical
Contract rig for Heron-3
150 km2 3D seismic Interpret 3D 1 discretionary well
Bathurst 3D (766 km2)
Outlook
Bathurst 3D (766 km2)
Drill ready Blackwood prospect
Heron-3
Heron-4 drill/drop option
Blackwood-2 drill/drop option
Plan 3D
3D
3DProcess 3D Interpret 3D
<> Heron3
<>
<>
1 Eni has options to increase its equity to 75% in either or both the Heron & Blackwood gas discoveries by funding MEO's expenditures
through to FID & paying MEO a one-off cash bonus of US$75 million on reaching FID for the 1st development.
MEO Australia Limited - Quarterly Report 3
North West Shelf: Offshore Carnarvon Basin WA-361-P (MEO 50% & Operator, Mineralogy 35%, Cue Energy 15%)
During the quarter, Fugro Multi Client Services Pty Ltd
completed the acquisition of the 1,318 km2 Zeus
multi- client 3D survey. MEO has committed to purchase 363
km2 of this survey which will meet the Permit
Year 2 (Jan
2012 - Jan 2013) work program obligation. The 3D survey will
determine whether the Heracles lead and other leads can be
matured towards prospect status and be considered as
potential candidates for a discretionary well in Permit Year
4 (Jan 2014 - Jan 2015).
W A - 3 6 1 - P
Zeus 3D to be
Purchased
WA-360-P (MEO 25% & Operator, Petrobras 50%, Cue Energy 15%, Moby Oil & Gas 10%)WHEATSTONE
W A - 3 6 0 - P
RANKIN
GOODWYN
PERSEUS RANKIN NORTH
The permit is currently in Permit Year 6 and expires on
31st January 2012. During the quarter, MEO
submitted an application to renew the permit for an
additional 5 years.
This process involves the mandatory relinquishment of 50% of
the permit area. MEO has applied to retain 8 of the 15
current graticular permit blocks.
PLUTO XENA
BRULIMAR
BRUNELLO
IAGO
NORTH TRYAL ROCKS
0
kilometers
20.00
Petrobras (50%) and Moby (10%) elected not to participate in the permit renewal and their participating interests will be distributed between MEO (62.5%) and Cue (37.5%) immediately prior to renewal.
Figure 3. Location Map - Carnarvon Basin Permits showing proposed WA-360-P
JULIMAR
relinquishment and portion of Zeus 3D Multiclient Survey to be purchased
Work Activity Schedule: WA-361-PPermit WA-361-P
2011 2012
2013
MEO PI 50%
Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator MEO J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Work program undertakings Geo studies 150 km2 new 3D, studies 3D interpretation, studies Activities
Historical
Zeus 3D (363 km2)
Outlook
Zeus 3D (363 km2) Drill ready prospect
Plan
3D Proc
Process 3D Interp 323 km2 3D
<>
Potential farm-in discussions Potential Farm-in discussions
Work Activity Schedule: WA-360-PPermit WA-360-P
2011 2012
2013
MEO PI 25% => 62.5%* Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator MEO J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Work program undertakings
Activities
Historical
Studies
Permit renewal
Outlook
Permit renewal*
Geo studies Foxhound 3D, studies Reprocess 3D multi-azimuth
>Artemis-1 work
Renew
Foxhound 3D (323 km2) Seismic reprocessing Drill ready prospect
3D Interp 363 km2 3D
Repro
Interp 3D
<>
Potential farm-in discussions Potential Farm-in discussions
* Subject to regulatory approval
MEO Australia Limited - Quarterly Report 4
Bonaparte Gulf: Petrel Sub-Basin
WA-454-P (MEO 100%)
MEO continued to assimilate the available technical data and
plan for Permit Year 1 seismic acquisition. Subsequent to the
end of the quarter MEO awarded a contract to CGGVeritas
Services SA for the acquisition of
the proposed 601 km2 Floyd 3D seismic survey
over the Marina gas and liquids discovery, together with
the
Breakwater prospect and surrounding exploration leads.
Acquisition is scheduled to commence following completion of
the Zeppelin 3D seismic survey.
This survey is designed to enhance the mapping of the Marina
gas and liquids discovery to: refine the assessment of the
discovered volumes; optimise the selection of a drilling
location on the Breakwater prospect and determine whether the
surrounding exploration leads can be matured to drillable
prospects. The commitment to the Floyd 3D seismic survey
brings forward the Permit Year 3 commitment and will replace
the Permit Year 1 obligation to acquire 300 km's 2D seismic
subject to receipt of regulatory approval.
Breakwater
Prospect
Leads
Floyd 3D
601 km2
Marina
Discovery
Figure 4 Location Map - Petrel Sub-Basin Permits showing Floyd Seismic Survey
Work Activity Schedule: WA-454-PPermit WA-454-P MEO PI 100%
2011 2012 2013
Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator MEO J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Work progra m unde rta kings
Activitie s
Historica l
Data assimilation Resource estimation Planning for 3D seismic Work program variation
Outlook
Work program variation*
300 km new 2D, studies 750 km 2D repro, studies 400 km2 3D
Data
Volume
Planning
Resource estimation
Volume
Volume
Floyd 3D seismic
Reprocessing
Drill ready prospect
3D Process 3D Interpret 3D
Repro Interp
<>
Farm-in discussions Farm-in talks
* Awaiting regulatory approval
MEO Australia Limited - Quarterly Report 5
Ashmore Cartier Region, Timor Sea: Vulcan Sub-Basin AC/P50 (MEO 100%)TENACIOUS PENGANA
JABIRU
AC/P51 (MEO 100%)During the quarter, planning for seismic data acquisition continued. Subsequent to the end of the quarter, MEO awarded a contract to
CASH MAPLE
SWAN
CHALLIS CASSINI
DELAM ERE
HALCYON
CGGVeritas Services SA for the acquisition of the Zeppelin 3D seismic survey. Acquisition commenced on 20th January.
PUFFIN
SKUA
ECLIPSE
EAST SWAN A C / P 5 3
BIRCH
A C / P 5 0
TALBOT
AC/P53 (MEO 100%)During the quarter, planning for seismic data acquisition continued. Subsequent to the end of
SWIFT NORTH SWALLOW
PADTHAWAY BILYARA MONTARA LEEUWIN
A C / P 5 1
Zeppelin 2D
169 line km
Zeppelin 3D
500 km2
the quarter, MEO awarded a contract to CGGVeritas Services SA for the acquisition of the Zeppelin 2D long offset seismic survey.
MARET
CRUX (GAS)
TAHBILK
CRUX
0 25.00
Acquisition was completed on 17th January.
LIBRA
kilometers
Work Activity Schedule: AC/P50 Work Activity Schedule: AC/P51Figure 5. Location Map - Vulcan Sub Basin Permits with Zeppelin Seismic
Surveys
Permit | AC/P51 | 2011 | 2012 | 2013 | |||||||
MEO PI Operator | 100% MEO | Sep Qtr | Dec Qtr | Mar Qtr | Jun Qtr | Sep Qtr | Dec Qtr | Mar Qtr | Jun Qtr | Sep Qtr | Dec Qtr |
MEO PI Operator | 100% MEO | J A S | O N D | J F M | A M J | J A S | O N D | J F M | A M J | J A S | O N D |
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | 1,000 km 2D | Studies | 1,000 km 2D | ||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | |||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | Planning 3D | ||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | WPV | ||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | |||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | |||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | 3D | Process 3D | Interpret 3D | ||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | <> | ||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | Farm-in talks | ||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) | Optional well | ||||||||||
Work progra m unde rta kings Activitie s Historica l Zeppelin 3D Work program variation Outlook Work program variation* Zeppelin 3D Drill ready prospect Farm-in discussions Discretionary well (2014/15) |
* Awaiting regulatory approval
Work Activity Schedule: AC/P53Permit | AC/P53 | 2011 | 2012 | 2013 | |||||||
MEO PI Operator | 100% MEO | Sep Qtr | Dec Qtr | Mar Qtr | Jun Qtr | Sep Qtr | Dec Qtr | Mar Qtr | Jun Qtr | Sep Qtr | Dec Qtr |
MEO PI Operator | 100% MEO | J A S | O N D | J F M | A M J | J A S | O N D | J F M | A M J | J A S | O N D |
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | 825 km2 3D repro, studies | 150 km long offset 2D | Studies | ||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | |||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | Planning 2D | ||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | WPV | ||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | |||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | Repro | ||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | 2D | Process 2D | Interpret 2D | ||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | <> | ||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions | Potential farm-in discussions | ||||||||||
Work program undertakings Activities Historical Zeppelin 2D Work program variation Outlook Reprocessing Zeppelin 2D Lead inventory Farm-in discussions |
MEO Australia Limited - Quarterly Report 6
Seruway PSC, North Sumatra (MEO 100%)
The PSC contains two significant gas discoveries - Gurame &
Kuala Langsa - together with a number of wells that have
intersected and tested gas and condensate. The PSC is
strategically situated in close proximity to LNG
infrastructure which has under-utilised capacity and a strong
domestic gas market. MEO has committed to acquiring 700
km2 3D seismic and to drill one well by the end
of 2012.
During the quarter, a contract was awarded to PT Nusantara
PGS for the acquisition of the Ibu Horst 3D seismic survey.
The 3D survey was completed in early January with 708
km2 of full fold data recorded.
NSO J
TERIPANG
S E R U W A Y P S C
Ibu Horst 3D Seismic Survey
ARUN GURAME
Ibu High
Cluster
708 km2
LEMURU
Juaro
Prospect
SALEM
0 25.00
KUALA LANGSA
kilometers
Figure 6.Location map - Seruway PSC (MEO 100%)
GOS
GLAGAH
Work Activity Schedule: Seruway PSCPermit Seruway PSC
MEO PI 100%*
2011 2012 2013
Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator SOEL* J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Work program undertakings
Activities
Historical
Work program variation
Plan Ibu Horst 3D
Ibu Horst 706 km2 3D
Outlook
100 km2 3D 1 well
Plan 3D
3D
2 wells
Ibu Horst 706 km2 3D Resource assessment
3DProcess
Interpret 3D Volumes
Well
Volumes
2 wells
Farm-in discussions Farm-in talks
Gurame development plan Gurame P.O.D
Farm-in talks
Kuala Langas JV discussions KL JD talks KL joint devmt discussions KL joint devmt discussions
* via Seruway Offshore Exploration Lim ited (SOEL); 100% owned b y MEO International Lim ited a wholly owned MEO sub sidiary
MEO Australia Limited - Quarterly Report 7
South Madura PSC, East Java (MEO 90%, Operator)
During the quarter, MEO executed a binding agreement to
acquire an additional 60% participating interest in the
PSC from AED South Madura BV for US$0.3 million cash. The
purchase is subject to customary approvals.
S O U T H M A D U R A P S C
Surabaja
0 25.00
kilometers
Figure 7. Location Map South Madura Island PSC (MEO 90%)
Work Activity Schedule: South Madura PSCPermit Sth Madura PSC
MEO PI 90%*
2011 2012 2013
Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Sep Qtr Dec Qtr
Operator SMEC+ J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Work program undertakings+
Permit expiry
Activities
Historical
AED assumes Operator AED in administration Purchase AED interest
Outlook
Assume Operatorship+ Work program variation
Studies under review+ under review+
<>
Pending + Pending +
* via South Madura Exploration Com pany (SMEC); 100% owned b y MEO International Lim ited a wholly owned MEO sub sidiary
+ sub ject to regulatory approval
MEO Australia Limited - Quarterly Report 8
Tassie Shoal Gas Processing Projects
(MEO 100%)
During the quarter, MEO regained a 100% unencumbered interest
in the Tassie Shoal Methanol Project by terminating the
2004
Joint Development Agreement and 2006
Amendment Agreement with Air Products and Chemicals Inc.
In consideration for terminating the agreements, MEO paid Air
Products US$1 million cash. Contingent payments capped at
US$6 million are payable out of any sale proceeds achieved by
MEO. Air Products will receive the first US$1 million of any
such
proceeds (refer ASX release of 19th
December 2011).
Figure 8. CAD schematic of Tassie Shoal Projects showing proposed LNG Plant, LNG Storage Tank and Phase 1 Methanol Plant.
New Ventures
MEO continues to seek attractive opportunities to supplement its current acreage portfolio. Our primary focus is on South East Asia however we actively evaluate opportunities beyond this primary focus region using rigorous merit/risk and capability criteria.
MEO Australia Limited - Quarterly Report 9
distribué par | Ce noodl a été diffusé par MEO Australia Limited et initialement mise en ligne sur le site http://www.methanol.com.au. La version originale est disponible ici. Ce noodl a été distribué par noodls dans son format d'origine et sans modification sur 2012-01-23 00:56:53 AM et restera accessible depuis ce lien permanent. Cette annonce est protégée par les règles du droit d'auteur et toute autre loi applicable, et son propriétaire est seul responsable de sa véracité et de son originalité. |
Documents associés | |
Quarterly Activities Summary For Period Ended 31st December 2011 |