Landore Resources Limited provided results of the preliminary metallurgical assessment of the BAM East Gold prospect mineralization on its Junior Lake Property, Ontario, Canada. Combined gold recovery by gravity concentration followed by cyanidation leach extraction of the gravity tail averaged about 98% for both composites tested. Gravity Concentration: Feed gold recovery to the pan concentrate ranged between 58% and 59% for Composite 1 and Composite 2. Between 0.02% and 0.03% of the feed mass was recovered to the pan concentrates grading between 3,687 and 6,977 grams/ton gold. Gold leach kinetics recorded for all tests at a nominal primary grind sizing of 75µm K80 were rapid, with close to peak gold extraction measured in the first sampling interval at 6 hours. Composite 1: Line 2600E, Drill-hole 0416-525 (NQ diamond core) from 65 meters depth, intersection reporting 1.90grams/ton (g/t) gold over 9.0m. There was no recorded visible gold (VG) and the highest grade was 6.38g/t over one meter. Total weight of Composite 1 was approximately 15 kilograms. Composite 2: Line 2400E, Drill-hole 0416-547 (HQ diamond core) from 217.25 meters depth, intersection reporting 2.32g/t gold over 16.68 meters. There were 6 recorded sightings of VG and the highest grade was 17.35g/t over one meter.