Jura Energy Corporation announced the development of well Sara-4, in the Sara Lease, has been successfully completed in the Sui Upper Limestone formation of Eocene age. During a 7 hour post-completion test on a 20/64 inch choke, the well flowed gas at an average rate of approximately 1.6MMcf/d (0.96MMcf/d net to Jura) with an average wellhead flowing pressure of approximately 730 psi. The development well Sara-4 was drilled to a total depth of 1,120 meters.

Sara-4 is located approximately 0.3 km from the existing Sara and Suri gas pipeline infrastructure. Anticipated future production from Sara-4 is expected to be entitled to a gas price of $2.30 per MMBtu, based on carriage and freight price of crude oil of $27 per barrel, under the Government of Pakistan's Modified 1994 Petroleum Policy. The Sara Lease covers an area of 82.72 km² and is located in the Middle Indus Basin of Pakistan, close to major industrial gas markets and infrastructure.