Godolphin Resources Limited announced the commencement of a 3,300 metre diamond drilling (DD) programme at Lewis Ponds. The drill rig located to Lewis Ponds, and commenced the first DD hole. The programme has been designed to achieve three objectives; (1) resource definition drilling in and around the existing Mineral Resource to improve confidence; (2) increasing the resources through drilling in areas which have been highlighted as exceptional targets outside the currently defined Mineral Resource, and (3) to provide mineralisation with high precious metals content for metallurgical test work. An RC drill rig has also been mobilised to Lewis Ponds to complete an initial 1,000 metre programme to drill a number of shallow targets and specifically test gold/base metal soil anomalies highlighted in a soil sampling survey undertaken in 2020. A revised resource for Lewis Ponds is currently being validated independently, and is close to finalisation.