29 January 2016
-
The successful completion of the non-renounceable entitlement offer ('Offer'), which closed on 17 December 2015, raised a total of
$1.395 million before costs of the Offer. The funds will be used to progress the evaluation and development of its 100% owned Mt Coolon Gold Project.
Mount Coolon Gold Project: - Eight major gold mineralising systems identified at the Mount Coolon Gold Project.
- 45 exploration prospects associated within these areas identified in a review of historical exploration data.
- GBM will continue to systematically process historical data, prioritising prospects with potential for oxide or high-grade epithermal gold mineralisation.
ASX Code: GBZ
COMPANY DIRECTORS
Peter Thompson
Managing Director/ Executive Chairman
Neil Norris
Exploration Director - Executive
Hun Seng Tan
Non- Executive Director CONTACT DETAILS
Principal & Registered Office
Suite 8, 7 The Esplanade, Mt Pleasant, WA 6153
Exploration Office
10 Parker Street,
Castlemaine, Victoria 3450
Website
www.gbmr.com.au
info@gbmr.com.au
Phone
+61 (8) 9316 9100
Fax
+61 (8) 9315 5475
Phone (Exploration Office)
+61 (3) 5470 5033
Forward work program at Mt Coolon Gold Project includes:
Commence a scoping study which will evaluate the potential to develop a heap leach gold mine based initially on oxide resources in the Eugenia and Bimurra Prospect areas.
Additional drilling to convert part of the Bimurra exploration target (refer ASX announcement 21 September 2015) to Resource category.
Metallurgical testwork on material from both prospects and mining studies will also be undertaken together with an overview of environmental, groundwater, cultural heritage and community matters.
Targeting extensions at the Koala Deposit which has Indicated Resources of 205,000 tonnes grading 5.9g/t for 39,600 ounces of gold, and the Glen Eva pit which has an Indicated Resource of 132,000 tonnes grading 7.8g/t for 33,000 ounces (refer ASX announcement 27 August 2015).
No LTI or environmental incidents were reported during the quarter. The Company has now completed 52 consecutive months with no LTI's and 98 consecutive months with no significant environmental incidents. GBM is committed to continuously improving safety and environment systems with the clear aim of achieving zero harm. Review of the company's safety management system continued throughout the quarter.
Following the detailed review of the gold resources at Mount Coolon last quarter and the generation of an exploration target estimate for the Bimurra prospect, GBM has continued to process and interpret the considerable volume of historic data available for the Mount Coolon project. The focus for the quarter has been to assess the exploration potential of the project area including the gold systems hosting the defined resources at Eugenia, Koala and Glen Eva.
GBM geologists have identified eight key mineralising systems which will be systematically assessed. Auriferous mineralising systems identified in the Mount Coolon Project tenements frequently contain multiple individual prospects, anomalies or targets for future exploration. Mineralising systems are located within broad north westerly trending structural corridors which have been identified as regionally significant and are considered favourable for formation of gold deposits. Key areas that have been identified are summarised and illustrated as follows:
1.7 million tonnes, averaging 1.0 g/t Au and containing an estimated 53,000 ounces of gold (ASX Release dated 27 August 2015). It is considered likely that exploration completed to date has not adequately tested the system limits, or the potential for a possible high-grade feeder zone to the mineralisation. In addition, exploration by previous explorers have demonstrated gold mineralisation at prospects located in close proximity including Boundary, Boundary North and Quarry.
Bimurra Prospect - GBM have estimated an Exploration Target range for the Perseverance-Elizabeth area of the Bimurra Prospect of between 10 million tonnes at an average grade of 0.7 g/t Au, containing an estimated 230,000 ounces of gold and 4 million tonnes at an average grade of 1.2 g/t Au, containing an estimated 120,000 ounces of gold. There is also evidence of high-grade epithermal veins with intersections including a0.5 metre interval which returned 51.5 g/t Au from 79 metres in hole DDHBIMS57( refer ASX release dated 21st
September 2015). It should be noted that the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
In addition, the Bimurra system hosts a number of prospects and mineral occurrences with characteristics typical of low sulphidation epithermal systems. Prospects identified to date include Blenheim, Hilltop, Perseverance, Elizabeth, Bimurra east, Cap Creek, Ramillies, Bungobine Peak and Bimurra North East. The system is located on the intersection of a north west structural corridor and a north east trending corridor which hosts the 3 million ounce Wirralie Gold Mine.
Table; Mount Coolon Gold Project Global Resource Summary August 2015. Please not rounding (1000's tonnes, 100's ounces, 0.1 g/t ) may cause minor variations to totals.
Figure: Mt Coolon Geology Map with tenement boundaries
GBM Resources Limited issued this content on 29 January 2016 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 31 January 2016 22:03:13 UTC
Original Document: http://www.gbmr.com.au/aurora/assets/user_content/file/1520334.pdf