"We are moving quickly on key items related to the JCM restart, which, once operational, will provide cash flow while the raffinate neutralization plant is being designed and built for our flagship asset, the
Godbe will also conduct 10,000 feet (3,050 meters) of infill and metallurgical drilling for S&H, as well as 4,000 feet (1,220 meters) in exploration drilling. Exploration drilling will evaluate a magnetic anomaly similar in size and intensity as the nearby S&H deposit. This anomaly is closer to the center of the JCM mineralized system than S&H and as such is a high priority target. The exploration drilling will also target an IP (Induced Polarization) anomaly along strike of known mineralization in the Peabody sill. See image.
The plan is to first drill the JCM deposit infill and metallurgical holes. These holes will be completed before the end of Q1, 2022. The drill rigs will then be moved to Strong & Harris and
About
Excelsior "
Excelsior's technical work on the
For more information on Excelsior, please visit our website at www.excelsiormining.com.
Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward looking information contained in this news release includes, but is not limited to, statements with respect to: (i) the future development plans for the
In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and mineral reserves, the realization of resource and reserve estimates, expectations and anticipated impact of the COVID-19 outbreak, copper and other metal prices, the timing and amount of future development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs (including the price of acid), the availability of labour, material and acid supply, receipt of and compliance with necessary regulatory approvals and permits, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the construction and operation of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not be sustained at the
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information is made as of the date of this news release. Except as required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking information.
View original content to download multimedia:https://www.prnewswire.com/news-releases/excelsior-mining-mobilizes-for-drilling-of-the-johnson-camp-mine-and-the-strong--harris-and-peabody-sill-deposits-arizona-301458312.html
SOURCE
© Canada Newswire, source