neer Resources Limited provided a drilling update for its 100%-held Pioneer Dome Lithium-Caesium-Tantalum (“LCT”) Pegmatite Project in the Eastern Goldfields of Western Australia. On 13 January 2017, the company provided a tabulation of high-grade caesium assays (>10% Cs2O) from drilling completed in December 2016, and advised that drilling would resume. Approximately 1,200m of RC drilling is now underway and is expected to be completed before the end of January, with assay results to hand by the end of February. Holes are designed to test for extensions to the Sinclair Caesium Zone south of drill hole PDRC083 and north of PCRC074; and as an initial test of a high priority lithium-caesium target located 175m south of the Sinclair Zone. The high-value caesium mineral pollucite has been intersected in drilling at the Sinclair Zone over a strike length of 60m prior to this round of drilling, including: PDRC015: 6m at 29.37% Cs2O from 47m1 (highest grade of 32.46% Cs2O from 50m); PDRCD068: 3.85m at 27.78% Cs2O from 44.35m2 (highest grade of 29.53% Cs2O from 46m); PDRCD071: 6.35m at 18.60% Cs2O from 41.4m2 (highest grade of 30.37% Cs2O from 42m); PDRC074: 7m at 17.12% Cs2O from 49m1 (highest grade of 25.44% Cs2O from 54m); PDRC083: 12m at 15.77% Cs2O from 43m1 (highest grade of 26.84% Cs2O from 47m); PDRC084: 4m at 14.53% Cs2O from 50m1 (highest grade of 16.20% Cs2O from 52m).