Eos Energy Enterprises, Inc. announced a firm order from EnerSmart to provide at least 90MWh, and as much as 180MWh, of energy storage over the next 24 months. The projects are planned to be powered by Eos’s innovative Znyth® battery technology to provide improved grid stability and increased renewables utilization across multiple locations in California. The first project, anticipated to supply 9MWh of storage in El Cajon to CAISO (California’s independent grid operator), is valued at $2 million with installation scheduled for the fourth quarter of 2021. The Eos Znyth® battery is designed to provide continuous power upon installation and is anticipated to have a useful life of 20 years. This positively ingenious storage solution developed in Edison, NJ is proven to be safe across a wide range of operating conditions and will be shipped from Eos’s manufacturing facility located in Pittsburgh, PA.