Engineer Gold Mines Ltd. announced that it is advancing environmental work as part of its application to complete a 10,000 tonne bulk sample at its Engineer Gold Mine project near Atlin, BC. The Company, with the support of its environmental consultants, Ensero Solutions Inc. (Ensero), based out of Whitehorse, Yukon are collecting environmental baseline data at the Engineer Gold Mine. The first phase of work carried out was an aquatic resources assessment which included the collection of benthic invertebrates, stream sediment, periphyton and surface water quality. Ensero also carried out a fish habitat assessment in lower Engineer Creek during the initial phase of work. Phase 2 beginning this week, includes additional surface water sampling and hydrology measurements in Engineer Creek and Tagish Lake and collection of waste rock, tailings, ore and soil samples for geochemical analysis. The environmental baseline data collected in 2021 is expected to support the advancement of permit applications towards obtaining authorization to complete a 10,000-tonne bulk sample.