Enertime: ORC installation contract with Suez
This installation is designed to generate electricity by recovering the heat produced by the Carrières-sur-Seine waste-to-energy plant during periods when this heat is not being fed into the district heating network.
An ORC can recover the heat contained in the fumes from incineration furnaces and convert it into electricity. To do this, an exchanger is installed on the flue gas.
The machine is scheduled for commissioning in April 2025.
Copyright (c) 2023 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction