Cadence Minerals plc (AIM/AQX: KDNC) is pleased to announce its interim results for the six months ended 30 June 2022.

OVERVIEW

The Company's goals for the six months ended 30 June 2022 were first to vest our 27% in the Amapa Iron Ore Project ('Amapa Project'), secondly to progress the development of Amapa and advance the Pre-Feasibility Study ('PFS') and lastly to create capital growth in our passive private investments via a sale either in cash or a swap into liquid equity. I am pleased to report the Company was successful in all of the above goals.

The first goal was met in the first quarter of this year. After successfully reaching an agreement to vest its 20% at the end of December 2021, Cadence increased its stake in the Amapa Project to 27% in March 2022; the consideration for the additional 7% was US$3.5 million. The funding was used to achieve our second goal, which was to advance the PFS. Although PFS work commenced in 2021, the March investment fully funded the remainder of the PFS study. The current expectation is that in Q4, we will publish an updated Mineral Resource Estimate ('MRE), followed by an Ore Reserve Estimate ('ORE') and, finally, the publication of the PFS.

The final goal was achieved via two asset sales; firstly, our 31.5% interests in Lithium Technology Pty Ltd and Lithium Supplies Pty Ltd ('LT and LS') were sold to Evergreen Lithium and secondly, our 30% interest in licenses within the Yangibana Rare Earth Project ('Yangibana Project') were sold to owner/operator Hastings Technology Metals. In both cases, Cadence agreed to vend these assets for equity in companies that are either listed or are expected to be listed.

Cadence has invested approximately GBP1.7 million in these assets, and our sale price into the equity of the two public companies was the equivalent of GBP5.5 million, representing a 321% cumulative return on our investments. The Yangibana sale is not reflected in the interim financial statements as it has not yet been completed. However, we expect that both the Yangibana Project transactions and the IPO of Evergreen Lithium will complete this year, hopefully further increasing our returns.

In contrast to these accomplishments, the macroeconomic environment has been generally negative. This has been dominated by the war in Ukraine and the devastating humanitarian consequences that have followed. The European war is the most serious crisis in decades, and food security and energy needs have emerged as significant concerns. We now live in a world of increased macro volatility, with central banks battling a problematic trade-off between soaring inflation and managing a fragile economic recovery in the aftermath of the COVID-19 pandemic.

Despite this challenging backdrop, the lithium and rare earth sectors have remained positive, with pricing in both products remaining robust. This demand continues to be driven by the electrification of our transport systems and the continued undersupply of feedstock. Despite some commentators suggesting otherwise, the oversupply of lithium is not imminent; we still see a market deficit going forward for the same structural reasons that we saw in 2018 when some of the same market commentators forecasted an oversupply of feedstock.

Within the iron ore market, we have seen the impacts of a global slowdown, with the 62% Fe Platts index dropping from US$125 per dry metric tonne ('dmt') to circa US$ 100 / dmt. Both short and longer-term prospects for iron ore are driven by China, given the nation is the world's biggest steel producer and currently buys about 70% of global seaborne iron ore. As policy support gains traction, we expect China to emerge as a source of stability for iron ore demand. This is contingent on Beijing implementing successful and timely stimulus measures, limited COVID lockdowns, and a shallow global slowdown that limits monetary tightening.

The overall negative macro environment weighed down on our public portfolio, with the AIM Basic Resources Index down some 30% over the period and European Metals Holdings ('EMH'), our largest public equity position, decreasing in value by some 47% during the reporting period.

We are cautiously optimistic despite the macroeconomic headwinds. Recent indications point to a recovery in China's growth momentum in the second half of the year, with cities reopening and government policy stimulus helping. In mined commodity markets, supply and demand are generally tight, and prices appear well supported. The transition to net zero carbon emissions will continue to open up investment opportunities in companies that serve the associated supply chains.

As outlined in our annual report and accounts, Cadence operates an investment strategy that includes investments in private projects via a private equity model and investments in public equity. In both investment classes, we take either an active or passive role. We have reported on each category below.

PRIVATE INVESTMENTS, ACTIVE

The Amapa Iron Ore Project, Brazil

Interest - 27% at 30/06/2022

The Amapa Project is a large-scale iron open pit ore mine with associated rail, port and beneficiation facilities that commenced operations in December 2007. Production increased to 4.8 Mt and 6.1 Mt of iron ore concentrate product in 2011 and 2012, respectively. Before its sale in 2012, Anglo American valued its 70% stake in the Amapa Project at US$462m (100% US $660m).

In 2019 Cadence entered into a binding investment agreement to invest in and acquire up to 27% in the Amapa iron ore mine, beneficiation plant, railway and private port owned by DEV ('The Agreement'). The Agreement also gave Cadence a first right of refusal to increase its stake to 49%. To acquire its 27% interest, Cadence invested US$6 million over two stages in a joint venture company ('JV'). The first stage is for 20% of the JV, the consideration for which was US$2.5 million. The second stage was completed in March 2022 for a further 7% of the JV for a consideration of US$3.5 million.

During the reporting period, the two key operational priorities were:

1. Progressing the permitting pathway, including the regularisation of the mining concessions, tailing storage facilities and the environmental permits.

2. Advancing the PFS, which commenced in 2021, and progressed in earnest once the second stage funding from Cadence vested.

At the time of writing, the PFS is progressing well with all the mineral processing and logistic studies completed and costed. The updated MRE and ORE are both due for completion in October 2022.

The PFS contemplates refurbishing and rehabilitating the existing port, rail and plant with modifications being made to the beneficiation plant to achieve a larger portion of 65% iron concentrate (4.9 Mt). The PFS is based on producing 5.3 Mt of iron ore concentrate per annum. The PFS, once complete, will outline more fully the development timelines and capital required to achieve the stated project aims. After the publication of an economic PFS, we expect DEV will seek to commission a Definitive Study ('DFS'). The DFS is required to seek project debt and equity finance, which will be sought once the DFS is complete.

PRIVATE INVESTMENTS, PASSIVE

Evergreen Lithium Limited

Interest - 13.16% at 30/06/2022

During the reporting period, Cadence and the shareholders of LT and LS completed the sale of 100% of LT and LS to Evergreen PTY Ltd ('Evergreen'). Evergreen is an unlisted public company in Australia that has been incorporated explicitly to acquire lithium assets. The acquisition of LT and LS is its first acquisition. Evergreen raised AS$ 6 million to pursue this strategy and now plans to list on the Australian Stock Exchange.

The consideration for LT and LS is up to A$ 21.05 million (GBP12.79 million). Cadence had 31.5% of LT and LS and will receive up to A$ 6.63 million (GBP4.02 million). The initial consideration that has been paid is AS$3.16 million (GBP1.92 million) in Evergreen shares, or 15,830,136 shares at A$0.20 per share, representing 13.16% of Evergreen.

Subject to performance milestones being achieved (found here), an additional AS$3.47 million (GBP2.10 million) will be paid in Evergreen shares. If the performance targets are met, the total consideration for Cadence's equity stake in LT and LS would be AS$6.63 million (GBP3.80 million).

As a result of the acquisition, Evergreen, through its subsidiaries, are the holder of two exploration licenses in the Northern Territory, one granted and one in the application phase. LT and LS further hold seven exploration license applications in Argentina.

All of the licenses and applications target potential hard rock lithium deposits. The most significant of these is the Litchfield lithium prospect, which is contiguous to Core Lithium's (ASX: CXO) strategic Finniss Lithium Project (JORC compliant ore reserves: 7.4Mt @ 1.3% Li2O). Evergreen has committed to spending at least A$4 million on the exploration of Litchfield during the three years post the completion of the sale.

Cadence's total investment in the LT & LS was GBP0.81 million. The Company has received GBP1.92 million as an initial consideration and, subject to project milestones, will receive a further GBP2.1 million. This represents a 159% return on the initial consideration and a 395% return on the cumulative consideration.

Yangibana Project, Australia

Interest - 30% at 30/06/2022

The Yangibana Project is a significant Australian Rare Earths Project, containing substantial Neodymium and Praseodymium resources. The Yangibana Project currently covers approximately 650 square kilometres containing some 9 Mining Leases, 2 Prospecting Licenses and 19 Exploration Licenses. Cadence holds a 30% interest in 3 Mining Leases and 6 Exploration licenses. These tenements contain 0.70 million tonnes of Ore Reserves, which can increase the expected mine life of the Yangibana Project by approximately one year to a total of 16 years.

In June 2022, Cadence entered into a binding agreement to sell its working interest in the leases to Hastings Technology Metals (ASX: HAS) ('Hastings'), the current owner and operator of the Yangibana Project.

The interests will be sold for A$9.0 million (GBP5.45 million) to be settled by the issue of fully paid ordinary shares in Hastings at a price to be determined based on 30 days VWAP before completion, which is set at six months from the date of signing of this agreement.

Hastings has commenced site construction and is planning to begin commissioning the beneficiation plant in late 2023, delivering maiden production to key customers in 2024.

In February of this year, Hastings published a revised NPV calculation, which increased the NPV by 84% to AS$ 1 billion. Hastings's current market capitalisation is circa A$ 415 million. Also, in February, the Australian Government's Northern Australia Infrastructure Facility (NAIF) approved a $140 million loan facility to Hastings and Yangibana, making it the first Australian rare earth project to receive NAIF funding.

Cadence's total investment in the Leases was GBP0.90 million. Subject to the completion of the sale, we will receive approximately GBP5.45 million in Hasting shares, representing a 502% return on our investment.

Sonora Lithium Project, Mexico

Interest - 30% at 30/06/2022

Cadence holds an interest in the Sonora Lithium Project via a 30% stake in the joint venture interests in each of Mexalit S.A. de CV ('Mexalit') and Megalit S.A. de CV ('Megalit').

Mexalit forms part of the Sonora Lithium Project. The Sonora Lithium Project consists of ten contiguous concessions covering 97,389 hectares. Two of the concessions (La Ventana, La Ventana 1) are owned, as of the date, 100% by subsidiaries of Gangfeng Lithium Co., Ltd ('Gangfeng'). El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions are owned by Mexalit S.A. de C.V. ('Mexalit'), which is owned 70% by Gangfeng and 30% by Cadence.

The Sonora Project holds one of the world's largest lithium resources and benefits from being both high-grade and scalable.

A feasibility study report was published in January 2018. The report estimated a pre-tax project net present value of US$1.253 billion at an 8% discount rate, an Internal Rate of Return of 26.1% and Life of Mine operating costs of US$3,910/t of lithium carbonate. It should be noted that under the published feasibility study, the concession owned by Mexalit will be mined starting in year 9 of the mine plan, ceasing at the end of the mine life in year 19.

In 2021, Mexican politicians from the MORENA party tabled a draught bill to reform Mexico's energy sector, including statements that lithium would be included among the minerals considered strategic for the energy transition and that no new concessions for lithium exploitation by private companies could be granted. Subsequent to the year-end, the Mexican senate elevated lithium deposits to the category of 'strategic minerals', declaring lithium's exploration, exploitation, and use as the state's exclusive right.

We are constantly examining possible legislative changes, and Gangfeng is ensuring that the mineral concessions remain legitimate. It is our current view that the Decree passed by the senate only impacts licenses, concessions, or contracts to be granted, NOT already those already granted, as is the case for the Sonora Lithium Project. Therefore, at this point, we do not believe there is a material impact on our joint venture areas.

Contact:

Cadence Minerals plc

T: +44 (0) 20 3582 6636

Andrew Suckling

Kiran Morzaria

WH Ireland Limited

NOMAD & Broker

T: +44 (0) 20 7220 1666

James Joyce

Darshan Patel

(C) 2022 Electronic News Publishing, source ENP Newswire