Copper Lake Resources Ltd. announced that the company has completed a channel sampling, mapping, core assaying and prospecting program over the Billiton Main VMS prospect area within the Marshall Lake project area during the 2016 field program. Channel sampling at Billiton Main Prospect yields of Up to 2.36 g/t Au, 60 g/t Ag, 1.61% Cu, and 4.20% Zn over 0.60m, Up to 0.64 g/t Au, 286 g/t Ag, 3.05% Cu and 5.60% Zn over 0.80m. Core assays from previous drilling at the Billiton Main Prospect of up to 28.70 g/t Au, 271 g/t Ag, 3.43% Cu and 6.05% Zn. Grab samples from regional prospecting of up to 0.96 g/t Au, 23 g/t Ag and 1.15% Cu at the VTEM-005 target. Grab sampling of up to 4.05% Zn from the VTEM-008 target.