Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output - 1099 MWe
  • Electricity production since the beginning of the year: 104 309 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1101 MWe
  • Electricity production since the beginning of the year: 105 695 MWh

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 05 January 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 January 2021 13:03:06 UTC