Cartier Resources Inc. (Cartier) announced new results from its ongoing 30,000-m drilling program on the Chimo Mine property, located 45 km east of Val-d'Or. These results are associated with the 2B Zone (2 structure) and the 4E Zone (4 structure) intersected respectively at 230 m and 110 m east-northeast of the shaft. In the 2B Zone, an intersection grading 7.5 g/t Au over 2.0 m included within 2.1 g/t Au over 9.8 m was cut 90 m below drill hole CH17-16 which returned 25.0 g/t Au over 2.0 m included within 9.4 g/t Au over 6.5 m. This intersection extends the gold mineralization of the 2B Zone to a depth of 350 m. In the 4E Zone, an intersection grading 4.4 g/t Au over 2.1 m included within 1.4 g/t Au over 12.7 m was cut 140 m below drill hole CH17-16 which returned 12.3 g/t Au over 0.7 m included within 6.3 g/t Au over 1.9 m.