The Solar Power Generation and CO2 Reduction Data
Canadian Solar Infrastructure Fund, Inc. (hereinafter referred to as "The Fund" or "CSIF") hereby announce its Solar Power Generation and CO2 Reduction data for March 2022.
1. Monthly Solar Power Generation and CO2 Reduction Data
FY of June, 2022 | ||||||
Total PV Facilities | Solar Module Output (MW) | Forecast Power Generation (kWh) (A) (*1) | Actual Power Generation (kWh) (B) (*2) | Difference (kWh) (B) - (A) | CO2 Reduction (kg-CO2) (*3) | |
January | 25 | 183.97 | 12,304,414 | 13,240,937 | 936,532 | 5,240,940 |
February | 25 | 183.97 | 13,524,001 | 14,646,183 | 1,122,182 | 5,790,955 |
March | 25 | 183.97 | 18,008,752 | 19,370,168 | 1,361,416 | 8,202,832 |
April | 20,989,031 | |||||
May | 21,309,957 | |||||
June | 17,755,723 | |||||
Total | - | - | 103,891,878 |
(*1) Forecast Power Generation is based on the Forecast Power Generation (P50) provided in the independent technical report.
(*2) Actual Power Generation is based on SCADA (Supervisory Control and Data Acquisition) system data generation.
(*3) CO2 reduction is calculated as based on adjusted emission coefficient by electric power companies. For more details, please refer to the link(https://www.env.go.jp/press/104919.html).
2. Solar Power Generation During the Month of March 2022
The Fund portfolio generated actual electricity production of 19,370,168kWh during the month of March 2022, equivalent to 107.56% of the forecasted electricity production although the lower power generation at CS Takayama-shi PV caused by damage to panels and mounts that was announced in the "Notice Concerning Suspension of Power Generation at Assets Under Management" on April 6, 2022.
Month of March 2022 | ||||
PV Facility | Solar Module Output (MW) | Forecast Power Generation (kWh) (A) | Actual Power Generation (kWh) (B) | Actual vs Forecast (%) (B/A) |
CS Shibushi-shi | 1.22 | 118,702 | 103,961 | 87.58% |
CS Isa-shi | 0.93 | 98,738 | 86,200 | 87.30% |
CS Kasama-shi | 2.13 | 236,071 | 221,789 | 93.95% |
CS Isa-shi Dai-ni | 2.01 | 225,553 | 202,300 | 89.69% |
CS Yusui-cho | 1.75 | 204,391 | 161,370 | 78.95% |
CS Isa-shi Dai-sand | 2.23 | 240,986 | 220,795 | 91.62% |
CS Kasama-shi Dai-ni | 2.10 | 233,403 | 225,900 | 96.79% |
CS Hiji-machi | 2.57 | 280,170 | 288,760 | 103.07% |
CS Ashikita-machi | 2.35 | 247,895 | 224,010 | 90.36% |
CS Minamishimabara-shi (East)(West) | 3.93 | 432,324 | 390,466 | 90.32% |
CS Minano-machi | 2.45 | 309,058 | 261,191 | 84.51% |
CS Kannami-cho | 1.34 | 146,189 | 160,236 | 109.61% |
CS Mashiki-machi | 47.69 | 4,445,711 | 4,728,200 | 106.35% |
CS Koriyama-shi | 0.64 | 70,423 | 72,613 | 103.11% |
CS Tsuyama-shi | 1.93 | 204,049 | 204,298 | 100.12% |
CS Ena-shi | 2.12 | 226,339 | 233,160 | 103.01% |
CS Daisen-cho(A)(B) | 27.3 | 1,632,845 | 2,801,500 | 171.57% |
CS Takayama-shi | 0.96 | 87,609 | 31,708 | 36.19% |
CS Misato-machi | 1.08 | 134,493 | 138,898 | 103.27% |
CS Marumori-machi | 2.19 | 248,063 | 252,662 | 101.85% |
CS Izu-shi | 10.78 | 1,096,031 | 1,294,900 | 118.14% |
CS Ishikari Shinshinotsu-mura | 2.38 | 241,129 | 322,594 | 133.78% |
CS Osaki-shi Kejonuma | 0.95 | 90,659 | 97,777 | 107.85% |
CS Hiji-machi No.2 | 53.4 | 5,825,375 | 5,761,300 | 98.90% |
CS Ogawara-machi | 7.51 | 932,545 | 883,580 | 94.75% |
Portfolio Total | 183.97 | 18,008,752 | 19,370,168 | 107.56% |
3. Solar Power Generation During the Period from April 2021 to March 2022
The Fund portfolio generated actual electricity production of 205,426,681kWh during the period from April 2021 to March 2022, which is equivalent to 98.97% of the forecasted electricity production.
From April 2021 to March 2022 | |||
PV Facility | Forecast Power Generation (kWh) (A) | Actual Power Generation (kWh) (B) | Actual vs Forecast (%) (B/A) |
CS Shibushi-shi | 1,407,324 | 1,242,469 | 88.29% |
CS Isa-shi | 1,058,751 | 969,630 | 91.58% |
CS Kasama-shi | 2,405,418 | 2,309,629 | 96.02% |
CS Isa-shi Dai-ni | 2,427,267 | 2,208,884 | 91.00% |
CS Yusui-cho | 2,077,311 | 1,794,829 | 86.40% |
CS Isa-shi Dai-san | 2,622,093 | 2,405,234 | 91.73% |
CS Kasama-shi Dai-ni | 2,375,164 | 2,345,103 | 98.73% |
CS Hiji-machi | 3,115,347 | 3,078,780 | 98.83% |
CS Ashikita-machi | 2,708,526 | 2,560,036 | 94.52% |
CS Minamishimabara-shi (East)(West) | 4,795,359 | 4,646,755 | 96.90% |
CS Minano-machi | 3,075,636 | 2,790,120 | 90.72% |
CS Kannami-cho | 1,573,644 | 1,590,722 | 101.09% |
CS Mashiki-machi | 55,011,530 | 54,458,600 | 98.99% |
CS Koriyama-shi | 720,351 | 761,832 | 105.76% |
CS Tsuyama-shi | 2,124,594 | 2,072,857 | 97.56% |
CS Ena-shi | 2,391,503 | 2,470,380 | 103.30% |
CS Daisen-cho(A)(B) | 26,253,265 | 27,739,497 | 105.66% |
CS Takayama-shi | 956,343 | 783,804 | 81.96% |
CS Misato-machi | 1,304,828 | 1,359,487 | 104.19% |
CS Marumori-machi | 2,488,354 | 2,469,044 | 99.22% |
CS Izu-shi | 12,233,770 | 13,627,610 | 111.39% |
CS Ishikari Shinshinotsu-mura | 2,611,846 | 2,851,306 | 109.17% |
CS Osaki-shi Kejonuma | 923,130 | 969,323 | 105.00% |
CS Hiji-machi No.2 | 62,135,024 | 59,218,600 | 95.31% |
CS Ogawara-machi | 8,764,694 | 8,702,150 | 99.29% |
Portfolio Total | 207,561,071 | 205,426,681 | 98.97% |
EndURL of CSIF:
https://www.canadiansolarinfra.com/en/
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Canadian Solar Infrastructure Fund Inc. published this content on 07 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 07 April 2022 06:12:15 UTC.