Big Gold Inc. announced the completion of infill sampling as part of Phase 2 Exploration of the Tabor Property (Tabor or the Project), situated within the Shebandowan Greenstone Belt in the northwest of Thunder Bay, Ontario. The infill sampling program was completed at the MNDM Thunder Bay Core Library, which houses approximately 100,000 m of historic core from the Thunder Bay Mining District. The core library provided the Company access to historic core drilled in 1983 in the East Divide area, which yielded multi-element potential in multiple drill holes, such as RS-83-01, which intersected 0.76 m of 24.30 g/t Au, 65.10 g/t Ag, 0.82% Cu, and 3.68% Zn.

Samples are currently being assayed and the Company expects results in early First Quarter, 2024. The infill sampling program provided the following at a low cost: Review historic core and confirm lithology, mineralization, alteration, veining, and structures previously logged; Obtain photos of the historic core for future reference; Infill samples (half-core) in previously unsampled core (60 samples); Resampled previously sampled core for confirmation of zones (26 samples); Data can be used to reduce exploration and drill costs in 2024. Phase 2 Plan for Priority Targets: Surface Exploration: Additional field visits may take place to define targets for further detailed mapping and sampling of outcrops; Re-logging and Sampling of Historic Core: Four historic drill holes on the Property have been sampled, results are in progress; IP Survey: Plans are in place to conduct IP surveys, aiding in further exploration and drill target definition; Drill Program: Leveraging data from the summer field program, the company will refine drill targets and build a database to expedite exploration success.