Banyan Gold Corp. provided an update on the 2024 exploration program at it's AurMac Project (AurMac), located in the Mayo Mining District, Yukon. Drilling at AurMac is underway with immediate targets on the Powerline Deposit, as part of the 5,000 metre (m) drill program announced on April 18, 2024, which will guide potential drill targets for the next 15,000 m of drilling planned for 2024.

Additionally, the development of a three-dimensional geophysical model for AurMac is underway and an airborne geophysical survey will be completed for AurMac and at the Nitra property. Soil sampling grids will be also completed at Nitra to define future drill targets.