Auris Minerals Limited provided the following update on exploration completed by Sandfire Resources Limited during the December 2021 quarter across the Joint Venture Projects located in the Bryah Basin, Western Australia. A total of 15 holes for 1,420 metres were completed. The completed drilling is designed as a 400x100m infill pattern to provide high quality litho-geochemical data and key geological information to delineate the upper Narracoota stratigraphy, known to be host to VMS-style mineralisation.

All results from the completed drilling are pending. No further Air Core drilling is currently planned for the March 2022 quarter at the Morck Well Project. RC drilling will be designed to follow-up on any geochemical anomalism observed as required.