Auriant Mining AB (publ) announced that in 2019, the company aims to produce 940 kg (30,221 oz) of gold at Tardan (both heap leach and CIL) and 90 kg (2,893 oz) at Solcocon, a total of 1.03 tonnes (33,114 oz).