ASX ANNOUNCEMENT

For personal use only

18 March 2022

Drilling Extends Ni-Co Sulphide Mineralisation Along 250m strike at Bardwell

Key Highlights

  • Multiple significant intercepts at Bardwell Prospect have extended the drill tested strike to 250m, intercepts include:
    o DDED21-059intersected 183m at 0.38% Ni and 0.012% Co ending in mineralisation, starting from 84m including 76.2m at 0.46% Ni and 0.013% Co
    o DDED21-060intersected 293m at 0.32% Ni and 0.012% Co ending in mineralisation, starting from 52m including 51m at 0.45% Ni and 0.016% Co
    o DDED21-061intersected 165.1m at 0.33% Ni and 0.013% Co ending in mineralisation, starting from 220m including 50m at 0.4% Ni and 0.016% Co
  • Results presently pending for 5 holes at Bardwell, extensive nickel sulphides logged
  • Maiden drill hole into Elbow Prospect, 2.7km East-North-East of Bardwell, DDED22-078 intersected 321.2m at 0.28% Ni and 0.01% Co ending in mineralisation starting from 41.8m

Figure 1: Boomerang Target plan view

ASX: ASO

Page 1 of 22 / ACN 144 079 667 / Suite 23, 513 Hay Street, Subiaco, WA info@astonminerals.com / www.astonminerals.com / +61 (08) 6143 6740

For personal use only

Aston Minerals Limited (ASX: ASO, 'Aston Minerals' or 'the Company') is pleased to provide an update on drilling results and exploration underway across the Bardwell and Elbow Prospects within the Boomerang Nickel-Cobalt Target, Edleston Project, Canada.

Managing Director, Dale Ginn, commented "We have confirmed 250m of strike so far at Bardwell from a total of ~1,000m of prospective strike and have hit substantial nickel sulphides on each section. The incredible thickness and consistency of mineralisation gives us a strong degree of confidence in the substantial potential endowment of this Prospect.

To further extend the understanding of the distribution of mineralisation within the Boomerang Target, we decided to drill a hole at the Elbow Prospect. This is located 2.7km east-north-east of Bardwell. DDED22-078 reported 321.2m at 0.28% Ni and 0.01% Co from the shallow downhole depth of 41.8m. As we progress through infill between areas of defined mineralisation, on an extremely broad spacing, we are yet to find a zone within this 6.5km long intrusion that is not mineralised to a significant degree.

We look forward to providing further regular updates on the progress underway across Bardwell and other prospects within the Boomerang Target."

Bardwell Drilling

A total of 10 holes covering 250m of strike have been completed across Bardwell. Core processing and analytical results are presently pending for 5 of these holes.

Figure 2: Plan view of Bardwell with interpreted geology, current drilling and planned drilling

Page 2 of 22 ACN 144 079 667 Suite 23, 513 Hay Street, Subiaco, WA info@astonminerals.com www.astonminerals.com +61 (08) 6143 6740

For personal use only

Figure 3: Cross Sections of Bardwell- Looking North

Page 3 of 22 ACN 144 079 667 Suite 23, 513 Hay Street, Subiaco, WA info@astonminerals.com www.astonminerals.com +61 (08) 6143 6740

For personal use only

The final batch of results for DDED21-059 was returned which resulted in the mineralised intercept increasing to 83m at 0.38% Ni and 0.012% Co ending in mineralisation. In addition, significant results were reported for DDED21-060 and DDED21-061:

  • DDED21-060intersected 293m at 0.32% Ni and 0.012% Co ending in mineralisation, starting from 52m including 51m at 0.45% Ni and 0.016% Co
  • DDED21-061intersected 165.1m at 0.33% Ni and 0.013% Co ending in mineralisation, starting from 220m including 50m at 0.4% Ni and 0.016% Co

Detailed geological logging of DDED22-080,DDED22-082 and DD22-084 has defined extensive nickel sulphide mineralisation.

Figure 4: DDED22-082, 336.05m: Blebby heazlewoodite-pentlandite in peridotite

Page 4 of 22 ACN 144 079 667 Suite 23, 513 Hay Street, Subiaco, WA info@astonminerals.com www.astonminerals.com +61 (08) 6143 6740

For personal use only

Figure 5: DDED22-082: Hand Lens View of Blebby heazlewoodite-pentlandite in peridotite

Page 5 of 22 ACN 144 079 667 Suite 23, 513 Hay Street, Subiaco, WA info@astonminerals.com www.astonminerals.com +61 (08) 6143 6740

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Aston Minerals Ltd. published this content on 17 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 17 March 2022 23:20:10 UTC.