6cd7b417-762c-489e-881e-fd90879c4ea8.pdf

18 January 2016


ASX Announcement



ASX: PGI


ABN: 48 008 031 034


Registered Office:

55 Kirkham Road

Bowral NSW 2576 Australia PO Box 846

Bowral NSW 2576 Australia

T: +61 2 4861 1740

Email: admin@panterragold.com


Project Offices:

DOMINICAN REPUBLIC

Calle Mayaguano No. 2 Los Cacicazgos,

Santo Domingo, Distrito Nacional T: +1 809 482 0876


CANADA

880 - 580 Hornby Street Vancouver, BC, V6C 3B6 T: +1 604 806 0626

PanTerra Gold Limited Las Lagunas Gold Production in line with Forecast

PanTerra Gold Limited (ASX: PGI) (PanTerra Gold or the "Company"), advises gold production and revenues for the fourth Quarter from its Las Lagunas project in the Dominican Republic were in line with forecasts published in the Corporate Presentation released to the ASX on 2 October 2015.


However, current CIL recoveries and overall gold recoveries are currently down on forecasts due to a number of factors that are being addressed.


Plant performance for December 2015 was as follows:


Average Daily Production 2015

Details

Monthly Forecast

Oct

Nov

Dec

Throughput, t/d

2142

2,066

2,314

2,274

Head Grade, g/t Au

3.6

3.79

3.77

3.84

Flotation Recovery, % Au

79.0

79.0

78.7

77.3

CIL Recovery, % Au

63.0

58.8

57.2

55.5

Overall Recovery, % Au

49.8

46.4

45.0

42.9

Production, oz Au

123.0

120.6

126.1

120.3


Production for the Quarter to 31 December 2015 was as follows:



End

December Quarter

Previous Quarter

Variance vs Previous Quarter

YTD

Plant Throughput (t)

203,983

185,511

10.0%

758,389

Average head grade (g/t)

Gold

3.8

3.6

5.6%

3.4

Silver

38.5

36.4

5.7%

38.3

Recovery (%)

Gold

44.7

45.4

-1.5%

45.4

Silver

19.9

27.9

-28.5%

26.0

Production (oz)

Gold

11,132

9,707

14.7%

37,924

Silver

50,075

60,144

-16.7%

239,461

Sales (oz)

Gold

11,268

9,066

24.3%

37,941

Silver

48,803

63,437

-23.1%

244,469

Sales (US$m)

12.7

11.4

11.3%

47.1

Sales (A$m)*

17.7

15.8

12.1%

62.7

* Based on average exchange rate for the Quarter.


1

PanTerra Gold Limited issued this content on 2016-01-18 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 2016-01-18 01:09:01 UTC

Original Document: http://www.panterragold.com/files/Las Lagunas Production Update 18_1_2016.pdf