Amerigo Resources Ltd. Reports Production Results of Minera Valle Central for the Quarter and First Half Ended June 30, 2024
Production for the first half of 2024 was 30.0 M lbs, representing 48% of Amerigo?s 2024 copper production guidance of 62.4 M lbs. First half 2024 molybdenum production of 0.6 M lbs. is in line with Amerigo?s annual molybdenum production guidance of 1.2 M lbs.