Altiplano Metals Inc. to report on the November 2020 production results from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile. During November 2020, Farellon produced approximately 4,030 tonnes of mineralized Cu-Au material at an approximate grade of 1.80% copper with shipments for processing totaling 3,157 tonnes (including stockpiled material). Revenue in November was approximately $215,000 generating a marginal increase from October revenue of approximately $9,000. The November production figure represents an improvement of approximately 28% from October 2020 with November shipped material ending the month marginally higher than October. At November month end, an additional 950 tonnes were stockpiled and available to be shipped. At the end of November, advancement on the SW 382 m level completed 5.5 m of work beyond the intrusive dyke where grades of 1.65% Cu were observed. Development work has also begun on expanding the 389 m level to access the mineralized zone beyond the dyke. This work is expected to begin in January 2021. Further development of the Hugo Decline is also expected to continue in January to extend the underground workings and access the 370 m level. This work will provide two additional development headings to access the NE - SW trending vein system at the 370 m working level. These new access points will bring the total number of development headings to eight, once fully operational. The Hugo decline extension to the new 370 m level will be approximately 60 m.