Alphamin Resources Corp. provided production guidance for the second half of 2021. The company expects to mine lower tin grades averaging 3,2% to 3,5%, which at higher plant recoveries of 78% (including the FTP recovery) and monthly throughput of 36,000t amounts to contained tin production of between 900t and 1000t per month. Production guidance for H2 2021 is approximately 5,500t of contained tin (previous guidance: 6,500t). The grade of ore mined is expected to increase to an average of 4% from Second Quarter 2022 leaving this lower grade window as temporary.