ACME's Shatford-Birse claim area are contiguous to the south of Sinomine's world-class
Many regions within ACME's project area remain of interest and require further evaluation and exploration. Two broad areas in the
The west Shatford area in the 31 claim
The east Shatford area has multiple pegmatites in a broad deformation zone, some of which are associated with structural controls, similar to the interpreted structural control on the Tanco pegmatite.
A third region with exploration potential is the 6 claim Cat-Euclid claim block that covers the unexplored southerly extension of a structural belt that includes the Donner, Eagle, Irgon and Catail LCT pegmatites. It has not been drilled by ACME.
Analyses have been received from
Analytical results indicate four areas with anomalous Lithium (Li), Tin (Sn) or Tantalum (Ta) in pegmatites and one area with a broad lithogeochemical anomaly for Li, Cesium (Cs), Strontium (Sr) and Vanadium (V) with thin pegmatites with anomalous Ta.
A total of 26 individual pegmatites were intersected in 6 of 8 drill holes, varying up to 11 m in core length. The pegmatites are classified as simple pegmatites, without visible lithium-bearing minerals, but locally with visible trace tantalite. Six pegmatites in four drill holes contain anomalous Li, one anomalous Cs and two, anomalous Ta. None have economic grades but assay results confirm the occurrence of geochemically anomalous pegmatite bodies within strongly deformed metasedimentary rocks.
East of
West of
Three specific areas in the
The wallrock lithogeochemical halo and Ta-bearing pegmatites intersected by hole SL-08. A nearby, unexplored magnetic low feature, possibly related to a pegmatite body, occurs near hole SL-08 and is adjacent to a strong linear structural feature defined by magnetics. Outcrop sampling and soil geochemical surveys are recommended.
A 15 to 20m thick albitic pegmatite with a favourable approximately 040-degree structural trend occurs within a broad E-W deformation zone near hole SL-06. This is the largest known pegmatite on the ACME claim block. Outcrop is scarce in the area and a program of rock and soil sampling is recommended.
Two holes in the winter drilling program were successful in intersecting pegmatites occurring along approximately 045-degree cross structures within the main
About
Led by an experienced team,
Contact:
Tel: (604) 564-9045
Email: info@acmelithium.com
This news release may contain forward-looking information within the meaning of applicable securities laws ('forward-looking statements'). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words 'expects,' 'plans,' 'anticipates,' 'believes,' 'intends,' 'estimates,' 'projects,' 'potential' and similar expressions, or that events or conditions 'will,' 'would,' 'may,' 'could' or 'should' occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.
(C) 2023 Electronic News Publishing, source