UEX Corporation announced the 2018 drilling program on the Christie Lake Project (the "Project") is set to commence. The winter 2018 exploration program is underway, with the goal of expanding the uranium resources on the Yalowega Uranium Trend. The $1.5 million program consists of approximately 4,500 m of drilling in 9 holes. The program will focus on testing targets located along strike and northeast of the rora Deposit. The rora Deposit was discovered during the winter 2017 exploration campaign. Highlights from the 2017 winter discovery program includes hole CB-109, which intersected 22.81% U3O8 over 8.6 m from 475.1 to 483.7 m, and hole CB-116A, which returned 20.00% U3O8 over 8.5 m from 471.0 to 479.5 m. The 2017 summer drill program expanded the length of the rora Zone to at least 150 m and mineralization remains open along strike both to the southwest and to the northeast.